Specification
Carton sizes and cubing
Why beadwork is a volume problem before a weight problem — carton sizes, pieces per master, and the effect on a landed price.
See the detailOrdering · Freight
Beadwork is a bulky, light load. It fills a container by volume long before it reaches a weight limit, which changes how it should be packed, booked and quoted. Transit times themselves are a carrier figure, not ours.
After inspection, a bead order is export-packed and consolidated in our own Greater Noida quality and packing house, then booked for ocean freight from an Indian port. Cube rather than weight decides what the load costs, because beadwork fills a container by volume first. Transit durations are carrier figures that change by route and season, so they are quoted with your freight for the route you actually book.
We do not publish transit times, because they are not ours to publish. An ocean transit duration belongs to a carrier, a service and a season, and the figure that was true last quarter is not reliably true this one. A website that prints one is telling you about its own last shipment.
What is ours to say is the sequence, who books what, and the single most useful fact about moving beadwork: it is a bulky, light load. It fills a container by volume long before it approaches a weight limit. So freight cost on a bead programme is a packing problem, and the number to manage is cube.
Production finishes. The run moves to our quality control and packaging house in Greater Noida, which does first-article and lot AQL inspection, assembly and kitting, export packing and labelling, and consignment consolidation. Styles and colourways travelling to the same destination are consolidated there into one shipment.
The load is then booked, hauled to the port, cleared for export and sailed. On arrival it is cleared for import, duty is paid, and it is delivered inland. Which of those legs we handle and which you handle is decided entirely by the Incoterm, and nothing about that is negotiable after the quote — it is what the quote means.
Cube, then route, then season.
Cube is set by the format and the packing: pieces per carton, whether the format collapses, and whether a rigid header rail or bar forces an oversize carton. A non-collapsible wall piece is an exception to every efficiency argument — some constructions cannot be packed small.
Route and season are market conditions. They are quoted at the time, and they move.
Compressible: cube, through carton design; shipment count, through consolidation; and documentation delay, through getting the classification settled before the goods move rather than at entry.
Not compressible: the sailing. And not compressible at a seasonal peak: the booking. Production that finishes on time can still wait for space, which is why a seasonal plan should treat freight as a phase with its own risk rather than as the tail of production.
Three neighbouring pages finish the picture. Freight cubing is where the cube per carton actually comes from. Retail packing is where it is decided, because inner packing and strand restraint set how many pieces fit a carton. And incoterms decides which of these legs is inside the price you are comparing. Macramé knotting cubes better than a rigid bead panel, so a mixed load behaves differently again.
Ask for the cube per carton and per piece against your specification, and ask what carton change would improve it. That is the only part of the freight conversation you can influence after the design is fixed.
Then ask which Incoterm the price you are comparing was quoted on. Two quotes on different terms are not comparable, and this is the most common reason a cheaper-looking offer lands dearer.
The destination — the port or the warehouse, named — and the Incoterm you want quoted on. Also whether colourways and destinations can be consolidated, because consolidation is decided before beads are allocated and is hard to retrofit.
If you are buying on your own freight, supply the forwarder's details early so the export documents name the right party from the start.
Export packing, labelling and consolidation are scheduled against the run and sit outside the published 40-to-60-day production window. Booking depends on space. Sailing depends on the service. Import clearance depends on document completeness and on whether the classification is settled. Inland delivery depends on distance.
None of those has a published duration, and the way to plan is to use your own historical figures for each leg rather than an average stated by whoever is quoting the leg.
Under FOB, you pay freight, insurance, duty and inland delivery, and you book them. Under CIF, we carry freight and insurance to the destination port and you take it from there. Under landed duty paid we handle manufacturing, export, freight, duties and US warehousing and quote one delivered price at your chosen US location — no separate freight agents, customs brokers or surprise line items.
That last arrangement exists because we manufacture, import and warehouse product in the US ourselves, which is what makes a single delivered price possible rather than a bundled estimate.
At entry, on paperwork. A classification that was assumed rather than established, an origin marking that was not applied, a certificate that was required and not filed — each of those stops a load at the border, and the cost is demurrage plus a delayed floor set.
They also come unstuck on cube. A programme costed on a carton assumption and then packed differently lands at a different price, and nobody notices until the freight invoice.
Panel headers are the component that decides whether a format collapses at all.
It volumes out. Most home hardgoods reach a weight limit; beadwork reaches a volume limit, especially large-format hanging pieces on rigid headers. That means the standard levers — ship heavier, fill the weight allowance — do not apply, and the only real lever is carton design.
The second difference is fragility of a specific kind. Glass beads do not break from impact so much as from knocking against each other in transit, which is a restraint problem rather than a cushioning problem. Packing specifications written for ceramics get this wrong in both directions: too much padding, not enough separation.
That consolidation is where the time is won. Programmes in our record that shipped several styles and colourways to one destination as a single consolidated load moved faster and cheaper than the same volume split across shipments, and the UK and EU orders in the record were handled on exactly that basis — multiple styles, one programme, consolidated out of one house.
It also shows that ship dates agreed months ahead hold when the inspection and packing phases are given their own time in the plan, and slip when they are treated as overlap.
Extractable data
| Leg | Who books it | What sets its cost |
|---|---|---|
| Export packing and carton build | Us, in our own Greater Noida packing house | Pieces per carton, and whether the format is collapsible |
| Consignment consolidation | Us | Number of styles and colourways travelling together |
| Inland haulage to the port | Us under FOB and above; the buyer below it | Distance and carton cube |
| Export clearance | Us under FOB and above | Document completeness, and the classification used |
| Ocean freight | Us under CIF and landed duty paid; the buyer under FOB | Container volume used, plus route and season |
| Import clearance and duty | The buyer under FOB and CIF; us under landed duty paid | Classification, origin and any trade measure in force |
| Inland delivery to warehouse | Us under landed duty paid; the buyer otherwise | Distance and pallet count |
| US warehousing | Us where a landed programme includes it | Storage duration and handling |
Good to know
It depends on the Incoterm. Under FOB, freight is yours to book and pay. Under landed duty paid we handle manufacturing, export, freight, duties and US warehousing and quote you a single delivered price at your chosen US location, with no separate freight agents, customs brokers or surprise line items.
Favourably. Knotted work compresses, so it cubes better than a rigid bead panel on a header rail. Against that, bohemian and macramé production runs 60 to 90 days rather than 40 to 60, so the earlier phase is longer even though the freight phase is cheaper.
Cube can be compressed through carton design and by consolidating colourways into one shipment. Transit cannot: an ocean leg takes what the service takes. Air freight exists and is a different commercial product, not a compression of this one.
The transit duration, the freight rate and the carton cube for your specification. All three depend on route, season, format and packing, and publishing a figure for any of them would mislead more buyers than it helped.
A change to the format or the header can change the carton, and a changed carton changes the cube and therefore the freight. This is the main way a late design change shows up as a landed-cost change rather than as a unit-price change.
Count it as its own phase, from your own freight data or a current quote, and add consolidation and booking time in front of the sailing. At seasonal peaks the booking, not the sailing, is the constraint.
Keep exploring
Specification
Why beadwork is a volume problem before a weight problem — carton sizes, pieces per master, and the effect on a landed price.
See the detailReference
What FOB, CIF and landed duty paid each cover, where risk transfers, and why cross-term quote comparisons mislead.
See the detailPillar
Brief, rough cost sheet, colour match, sample, production, packing — the six stages with the real published timings.
How it is madeReference
Counting backwards from a floor-set date through sampling, production, inspection, freight and receiving.
Read the guideReference
Technical answers, sample ownership, accountability and margin: what actually changes between the two routes.
See the detail
Start a conversation
Send a reference, a colour chip or a sketch. Minimums are set per design and confirmed per quote; sampling is quoted separately and usually runs 16 to 20 days from an agreed brief.