Specification pillar

Specifying beadwork: what has to be on the drawing

Written by the beadwork desk of a leading beaded-décor manufacturer, for the person who has to draw it, schedule it, coordinate it and then sign it off — not for the person buying a curtain.

Close hand-strung strands of honey and amber glass beads filling one side of the frame, the beads packed bead against bead down every cord.

The short answer

A beadwork specification has to carry ten fields: product type, finished size, strand count or pitch, bead specification including the drill hole, colour references, pattern artwork, top fixing, edge shape and end beads, packing, and quantity with its destination. Beyond those, a drawing has to state tolerance and name the fire standard the project requires, because on a strung panel a classification belongs to the tested build.

Which decision should a specifier make first?

With measuring an opening. Three measurements and a floor-gap decision, and most of the dimensional errors we see never happen.

Then density and view through, which is the one page that changes the answer to every other question. A denser panel is heavier, costs more, conceals more and transmits less light, and all four of those move together. A specifier who has settled density has settled most of the brief.

Which specification decisions does this section cover?

Nineteen pages, each owning one decision a specifier has to make before beadwork can be drawn, scheduled or signed off. They cover measurement, the performance questions that get asked in design reviews, the geometry a drawing has to carry, fixing into a real building, programme and budget, and what gets handed over at the end.

Close hand-strung strands of honey and amber glass beads filling one side of the frame, the beads packed bead against bead down every cord.

The spec table above is the field list underneath all of it. Ten fields: with all ten a panel can be quoted and sampled, and with nine somebody in the studio is deciding on your behalf.

Why are the pages in project order?

By the order the decisions actually get made on a project. Measure the opening first, because nothing can be costed without dimensions. Then set density, because density drives weight, cost, privacy and light at once. Then the geometry — hem, colour under the real light source, tolerance. Then the building: substrate, ceiling fixing, sequencing. Then programme and budget. Then approval, maintenance and handover.

That sequence is deliberate. Most beadwork problems on site are caused by a decision made in the wrong order, usually a fixing chosen before a weight was known.

Which pages cover performance and fixings?

The performance set and the fixing set. Daylight and glare, privacy and sightlines, acoustic performance and airflow are the four questions that come up in a design review, and all four have real limits rather than performance figures.

Fixing into substrates, ceiling tracks and suspended fixings, and installation sequencing are the three the contractor will ask about. Tolerances in hand work is the one that prevents an argument at inspection, and fire performance in a specification is the one that has to be written carefully, because on a strung panel the classification belongs to the tested build rather than to the material.

How are weight and fire classification established?

Panel weight and fixing load are established on the build you specify. The approved sample is weighed, the fixing is sized to that weight, and the figure goes onto the tech pack as a recorded value — which is the only route to a number that is true for a specific build rather than for a category.

Fire performance works the same way. Specimens are built to the specified cord and header, and an accredited laboratory tests that build against the standard the project names.

Which pages cover budget and programme?

Budget per opening, programme and lead-time planning, and what to sample before sign-off. Those three cover the three questions that arrive before anybody has drawn anything: what will it cost, when can I have it, and what do I need to see first.

Budget per opening is the most used of the three, because the opening — not the metre and not the square metre — is the unit beadwork is costed in.

Which project numbers come with the quote?

The budget per opening, the programme dates, the test package and the spares allowance. All four depend on the opening count and the build, so all four are quoted rather than published.

What a specifier can take from these pages before a quote exists is the shape of the answer: which lever moves a budget, which phase moves a date, and which decisions have to be made before sampling rather than after.

What does the bench hold to?

The construction, the formats, the lead times and the inspection practice all come off beadwork we manufacture ourselves. Beaded décor runs 40 to 60 days after sample approval, sampling takes 16 to 20 days from an agreed brief, a door panel is about 90 by 200 cm, and thirty hand-strung strands on a single wooden dowel is the common build at that size.

The performance pages are written from how the materials behave in a hanging panel: how glass loads a cord, how wood moves with humidity, how a bone bead takes a drill, how a plated finish reads under warm light. Those are the things a plant learns by drawing, turning and stringing its own beads, and they are what a drawing needs before a sample exists.

Specification pages

The specification cluster, decision by decision

Extractable data

The ten fields of a bead specification

The field list we quote and sample against, with the unit each takes and what hand work realistically holds. Tolerances are held as a bench discipline against the approved sample.
FieldUnitWhat hand work holds
Product typeNamed formatExact — it is a category, not a dimension
Finished sizemm or in: width × longest dropWidth closely; drop to a stated tolerance
Strand count or pitchCount, or pitch in mm against a stated widthPer-strand pitch closely; cumulative width needs its own limit
BeadsOutside diameter and drill hole in mm, per beadPressed and moulded closely; hand-formed beads vary by nature
ColoursA colour reference or a physical chip per bead colourMatched at approval; dye lots move between runs
PatternArtwork or a numbered reference imageExact once mapped to a colour-count sheet
Top fixingHeader type and finished length in mmClosely — it is a joinery component
Edge and endsHem profile, longest and shortest drop, end-bead referenceTo a stated tolerance; shaped hems need the tightest
PackingMaster carton dimensions and pieces per masterTo the carton specification
Quantity and destinationUnits per colourway, named port or warehouseExact

Good to know

Questions buyers ask about Specifying beaded décor

Which page should I read first?

Measuring an opening, then density and view through. The first gives you the dimensions a quote needs; the second gives you the one performance decision that changes everything else — weight, cost, privacy and how much light gets through.

Where do these values come from?

The floor that makes the work. Construction, formats, tolerances and lead times are what our own plants hold to, and the performance pages are written from how glass, wood, bone and metal behave in a hanging panel. Where a value belongs to one build — panel weight, a fire classification — it is established on the approved sample and recorded on the tech pack.

Who reads a drawing before it is quoted?

The beadwork desk that will build it. Questions on anything missing come back within one business day, and a formal quote follows within 48 hours of a complete specification. The ten fields in the table above are the list a drawing is read against, and the drill hole is the one most often left off.

How is this section organised?

By the order the decisions get made: measure, then set density and performance, then draw the geometry, then fix it to the building, then programme it, then hand it over. Nineteen pages, each owning one decision.

Which values arrive with the project?

The four a specifier asks for most, and each belongs to a build rather than to a catalogue. Fire classification is tested on the specified construction — bead, cord, header and mount together. Panel weight is taken off the approved sample and the fixing sized to it. Minimums are set per design and confirmed with your quote. And beadwork is a visual and spatial device rather than an acoustic one.

Keep exploring

Related pages

Manufacturing

Door portal beadwork

Strands that frame an opening and leave a clear walk-through: arched and inverted-V drops, built to order on a turned dowel or a stained rail.

See the detail

Start a conversation

Bring us a bead you cannot find

Send a reference, a colour chip or a sketch. Minimums are set per design and confirmed per quote; sampling is quoted separately and usually runs 16 to 20 days from an agreed brief.