Pillar
Bead safety rules
Lead, CPSIA, Prop 65, REACH, fire standards, electrical listing and audit — what applies, who carries it, and what we hold.
Specs and sizesOrdering and import
Six stages, two published timings, and a short list of things that are quoted rather than printed. This is the order mechanics layer, written for the person who has to commit a purchase order.
A beaded order runs in six stages: brief, rough cost sheet, colour match, sample, production, then packing and shipping. Sampling takes 16 to 20 days from an agreed brief and is quoted separately. Production runs 40 to 60 days after sample approval for beaded décor, and 60 to 90 days for bohemian and macramé work. Every stage runs inside plants we own.
Terms are agreed against a specific quote. That is worth saying first because it is the question most often asked at the end of a quote conversation when it should have been asked at the start.
What can be said is what the terms attach to. A beaded programme has two separate commercial events: sampling, which is quoted separately and happens before any production commitment, and production, which runs 40 to 60 days after you approve the sample. A first order usually also carries test costs, which are quoted per market and can be spread across the units of the order rather than charged to the first shipment alone.
Ask for terms in writing against a specific quote, at the same time as you ask for the minimum. Both are per-programme numbers, and both are cheaper to agree before a sample exists than after.
Three. What to send covers the brief. Cost levers covers why the number came back where it did and which change moves it most. Minimums explains what actually drives one — bead availability, dye lots, and die cost where a design needs a bead that does not exist yet — and how it is set per design and confirmed with your quote.
A fourth is worth reading early if you are in a tender: India-against-China comparison, which names what the other origin does better rather than pretending it does not.
Sixteen pages covering the mechanics of placing and landing a beaded order: what to send to get a usable quote, what moves the price, how minimums are set, how sampling and approval run, the two published lead-time windows, the backwards count from a seasonal floor-set date, what inspection checks, what packing and labelling you have to specify, how freight and transit behave for a bulky low-density load, which Incoterm to quote on, the classification fork between made-up curtains and articles of glass beads, how to establish duty rather than guess it, how to verify that a maker owns the plant it claims, what changes when you deal with the plant directly, and a plain read on India against China for this product.
In the order the decisions actually arrive. A buyer does not begin with Incoterms; a buyer begins with "can this be made at my price, and will it land in time". So briefing and cost sit first, timing second, and landing mechanics last.
The split between this section and the compliance layer is deliberate. Anything that decides whether the goods may be sold at all — lead limits, age grading, fire testing, chemical restriction, electrical listing — lives under compliance. Anything that decides what the goods cost to land and when they arrive lives here. The two meet in the purchase order, which is why several pages end with the clause to write into it.
With the brief, because the fastest brief is the complete one. A drill hole not stated, a colour given as a word rather than a reference, a top fixing left open or a packing format assumed each turn a 48-hour quote into a two-week clarification loop. A complete brief turns that loop back into the 48-hour quote.
If a sample already exists and the question is timing, start at lead times and then the seasonal calendar. If the question is whether to trust the maker at all, start at the verification checklist.
Price, minimums and the test package. Minimums and pricing are set per design and confirmed with your quote, because a plain-strand panel and a fully patterned one use very different amounts of material and stringing time.
What comes before the quote is the rough cost sheet, which shows where the cost sits and which lever moves it. Formal quotes follow within one business day of a specification, and a multi-SKU programme starts with a discovery call.
Classification, duty and Incoterms, read in that order, because the duty position depends on the classification and the Incoterm decides who carries it. Inspection and AQL, if you are writing the quality clause. Packing and labelling, if the goods go straight to a retail floor rather than through a repack.
And the verification checklist, which is written to be used against any maker, not only against us. We publish it because we pass it.
On the specified build. Fire performance is tested on the construction that will ship — bead, cord, header and mount together — at an accredited laboratory, and the report names the construction it was run on rather than the material in the abstract.
That is why the standard belongs on the drawing before a design is signed off. The cord and the header carry most of the burden on a strung panel, so changing either one after sample approval means testing again. The fire pages set out each standard and what a report has to state before a specification can rely on it.
Every page in order mechanics
One page per decision a buyer has to make before a purchase order can be signed.
Reference
The nine fields a beadwork brief has to carry, what each one is used for, and what happens when one is missing.
Reference
A blank request-for-quote sheet and a bead tech pack template, field by field, usable with any maker.
Reference
The five levers that move a bead price, in order of effect, and why cost per square foot does not describe this product.
Reference
Minimums are set per design, and what sets one: bead availability, dye lots, tooling, and whether colourways can be consolidated.
Reference
16 to 20 days from an agreed brief, photographs approved before the sample ships, and why the sealed sample is the contract.
Reference
40 to 60 days after sample approval for beadwork, 60 to 90 for bohemian and macramé, with sampling in front of both.
Reference
Counting backwards from a floor-set date through sampling, production, inspection, freight and receiving.
Reference
The beadwork defect taxonomy, how each defect is detected, and which are rejects rather than repairs.
Reference
Every packing and labelling field a bead order needs, who supplies each value, and the two packing problems unique to beadwork.
Reference
Consolidation, booking and ocean transit after inspection, and why cube rather than weight drives the cost of a bead load.
Reference
What FOB, CIF and landed duty paid each cover, where risk transfers, and why cross-term quote comparisons mislead.
Reference
Made-up curtains against articles of glass beads: the real tariff fork on beaded panels and how the choice is argued.
Reference
The method for establishing duty on beaded décor: classification, the current tariff, trade measures, then a binding ruling.
Reference
Eleven checks that separate an operator from a listing: process questions, audit records, sample behaviour and site evidence.
Reference
Technical answers, sample ownership, accountability and margin: what actually changes between the two routes.
Reference
A plain origin comparison for beadwork: where hand labour wins, where tooling and volume win, and what decides it.
Extractable data
| Stage | What the buyer supplies | What we supply | Published timing |
|---|---|---|---|
| Brief | Product type, size, bead material, colour references, quantity, destination | Questions back on anything missing | Reply within one business day |
| Rough cost sheet | The commercial target, if there is one | Where the cost sits and which lever moves it | Formal quotes within 48 hours of a complete specification |
| Colour match | A colour reference or a physical chip per bead colour | Matched beads, confirmed on the sample | Inside the sampling window |
| Sample | Approval of the sample photographs | The sample, photographed before it ships | 16–20 days from an agreed brief, quoted separately |
| Production | A purchase order against the approved sample | Hand-strung production to the colour-count sheet | 40–60 days after sample approval |
| Packing and shipping | Carton, label and packaging specification; the port or warehouse | First-article and lot AQL inspection, export packing, consolidation | Quoted per programme |
Good to know
By the order of the decisions, not by the order of the paperwork. Briefing and cost come first because they decide whether a programme is viable at all. Sampling, lead time and the seasonal calendar come next because they decide whether it lands on time. Inspection, packing, freight, Incoterms, classification and duty come last because they decide what it costs to land.
Price, minimums, the duty position and the test package. Minimums and pricing are set per design and confirmed with your quote, and a duty rate moves with the tariff and with trade measures, so it is established against your own classification. These pages hand you the method and the levers for reading either one.
If you are about to send a brief, read what to send so the quote means something. If you already have a quote and are comparing makers, read the verification checklist. If you have a floor-set date, read the seasonal calendar and count backwards from it.
Our own plants and our own quality house. Glass is drawn and hand-strung in Firozabad, wood and dowels turned in Saharanpur, ceramic glazed and fired in Khurja, metal finished and plated in Moradabad, and every order inspected, packed and consolidated at Greater Noida before it ships. The stage sequence and both published windows come off that chain.
Questions on a brief go back within one business day, and a formal quote follows within 48 hours of a complete specification. The rough cost sheet comes before any sample is made, so a design is priced before it is built. Payment terms, cubing and the claims procedure are agreed with the programme against a specific design and destination.
Keep exploring
Pillar
Lead, CPSIA, Prop 65, REACH, fire standards, electrical listing and audit — what applies, who carries it, and what we hold.
Specs and sizesReference
16 to 20 days from an agreed brief, photographs approved before the sample ships, and why the sealed sample is the contract.
See the detailReference
40 to 60 days after sample approval for beadwork, 60 to 90 for bohemian and macramé, with sampling in front of both.
Specs and sizesReference
Minimums are set per design, and what sets one: bead availability, dye lots, tooling, and whether colourways can be consolidated.
See the detailReference
Eleven checks that separate an operator from a listing: process questions, audit records, sample behaviour and site evidence.
Specs and sizesReference
Specification sheets and definitions — the pages to send a designer before they draw.
Open the reference
Start a conversation
Send a reference, a colour chip or a sketch. Minimums are set per design and confirmed per quote; sampling is quoted separately and usually runs 16 to 20 days from an agreed brief.