Ordering and import

Ordering beaded décor, stage by stage

Six stages, two published timings, and a short list of things that are quoted rather than printed. This is the order mechanics layer, written for the person who has to commit a purchase order.

The short answer

A beaded order runs in six stages: brief, rough cost sheet, colour match, sample, production, then packing and shipping. Sampling takes 16 to 20 days from an agreed brief and is quoted separately. Production runs 40 to 60 days after sample approval for beaded décor, and 60 to 90 days for bohemian and macramé work. Every stage runs inside plants we own.

What payment terms are normal on a first order?

Terms are agreed against a specific quote. That is worth saying first because it is the question most often asked at the end of a quote conversation when it should have been asked at the start.

What can be said is what the terms attach to. A beaded programme has two separate commercial events: sampling, which is quoted separately and happens before any production commitment, and production, which runs 40 to 60 days after you approve the sample. A first order usually also carries test costs, which are quoted per market and can be spread across the units of the order rather than charged to the first shipment alone.

Ask for terms in writing against a specific quote, at the same time as you ask for the minimum. Both are per-programme numbers, and both are cheaper to agree before a sample exists than after.

Which three pages answer a buyer first?

Three. What to send covers the brief. Cost levers covers why the number came back where it did and which change moves it most. Minimums explains what actually drives one — bead availability, dye lots, and die cost where a design needs a bead that does not exist yet — and how it is set per design and confirmed with your quote.

A fourth is worth reading early if you are in a tender: India-against-China comparison, which names what the other origin does better rather than pretending it does not.

Which ordering stages does this section cover?

Sixteen pages covering the mechanics of placing and landing a beaded order: what to send to get a usable quote, what moves the price, how minimums are set, how sampling and approval run, the two published lead-time windows, the backwards count from a seasonal floor-set date, what inspection checks, what packing and labelling you have to specify, how freight and transit behave for a bulky low-density load, which Incoterm to quote on, the classification fork between made-up curtains and articles of glass beads, how to establish duty rather than guess it, how to verify that a maker owns the plant it claims, what changes when you deal with the plant directly, and a plain read on India against China for this product.

Why are the pages in decision order?

In the order the decisions actually arrive. A buyer does not begin with Incoterms; a buyer begins with "can this be made at my price, and will it land in time". So briefing and cost sit first, timing second, and landing mechanics last.

The split between this section and the compliance layer is deliberate. Anything that decides whether the goods may be sold at all — lead limits, age grading, fire testing, chemical restriction, electrical listing — lives under compliance. Anything that decides what the goods cost to land and when they arrive lives here. The two meet in the purchase order, which is why several pages end with the clause to write into it.

Where should a first-time buyer start?

With the brief, because the fastest brief is the complete one. A drill hole not stated, a colour given as a word rather than a reference, a top fixing left open or a packing format assumed each turn a 48-hour quote into a two-week clarification loop. A complete brief turns that loop back into the 48-hour quote.

If a sample already exists and the question is timing, start at lead times and then the seasonal calendar. If the question is whether to trust the maker at all, start at the verification checklist.

Which numbers come with a quote instead?

Price, minimums and the test package. Minimums and pricing are set per design and confirmed with your quote, because a plain-strand panel and a fully patterned one use very different amounts of material and stringing time.

What comes before the quote is the rough cost sheet, which shows where the cost sits and which lever moves it. Formal quotes follow within one business day of a specification, and a multi-SKU programme starts with a discovery call.

Which pages cover customs and shipping terms?

Classification, duty and Incoterms, read in that order, because the duty position depends on the classification and the Incoterm decides who carries it. Inspection and AQL, if you are writing the quality clause. Packing and labelling, if the goods go straight to a retail floor rather than through a repack.

And the verification checklist, which is written to be used against any maker, not only against us. We publish it because we pass it.

How is a fire requirement established?

On the specified build. Fire performance is tested on the construction that will ship — bead, cord, header and mount together — at an accredited laboratory, and the report names the construction it was run on rather than the material in the abstract.

That is why the standard belongs on the drawing before a design is signed off. The cord and the header carry most of the burden on a strung panel, so changing either one after sample approval means testing again. The fire pages set out each standard and what a report has to state before a specification can rely on it.

Every page in order mechanics

The order mechanics layer, page by page

One page per decision a buyer has to make before a purchase order can be signed.

Extractable data

The six stages, and who supplies what

Timings are the two published windows. Anything described as quoted is set against the design you specify and confirmed with the quote.
StageWhat the buyer suppliesWhat we supplyPublished timing
BriefProduct type, size, bead material, colour references, quantity, destinationQuestions back on anything missingReply within one business day
Rough cost sheetThe commercial target, if there is oneWhere the cost sits and which lever moves itFormal quotes within 48 hours of a complete specification
Colour matchA colour reference or a physical chip per bead colourMatched beads, confirmed on the sampleInside the sampling window
SampleApproval of the sample photographsThe sample, photographed before it ships16–20 days from an agreed brief, quoted separately
ProductionA purchase order against the approved sampleHand-strung production to the colour-count sheet40–60 days after sample approval
Packing and shippingCarton, label and packaging specification; the port or warehouseFirst-article and lot AQL inspection, export packing, consolidationQuoted per programme

Good to know

Questions buyers ask about Ordering beaded décor

How is this section organised?

By the order of the decisions, not by the order of the paperwork. Briefing and cost come first because they decide whether a programme is viable at all. Sampling, lead time and the seasonal calendar come next because they decide whether it lands on time. Inspection, packing, freight, Incoterms, classification and duty come last because they decide what it costs to land.

Which figures attach to a quote rather than a page?

Price, minimums, the duty position and the test package. Minimums and pricing are set per design and confirmed with your quote, and a duty rate moves with the tariff and with trade measures, so it is established against your own classification. These pages hand you the method and the levers for reading either one.

Which page should I read first?

If you are about to send a brief, read what to send so the quote means something. If you already have a quote and are comparing makers, read the verification checklist. If you have a floor-set date, read the seasonal calendar and count backwards from it.

Who runs these six stages?

Our own plants and our own quality house. Glass is drawn and hand-strung in Firozabad, wood and dowels turned in Saharanpur, ceramic glazed and fired in Khurja, metal finished and plated in Moradabad, and every order inspected, packed and consolidated at Greater Noida before it ships. The stage sequence and both published windows come off that chain.

How fast does a quote come back?

Questions on a brief go back within one business day, and a formal quote follows within 48 hours of a complete specification. The rough cost sheet comes before any sample is made, so a design is priced before it is built. Payment terms, cubing and the claims procedure are agreed with the programme against a specific design and destination.

Keep exploring

Related pages

Pillar

Bead safety rules

Lead, CPSIA, Prop 65, REACH, fire standards, electrical listing and audit — what applies, who carries it, and what we hold.

Specs and sizes

Reference

The sampling stage

16 to 20 days from an agreed brief, photographs approved before the sample ships, and why the sealed sample is the contract.

See the detail

Reference

Minimums per design

Minimums are set per design, and what sets one: bead availability, dye lots, tooling, and whether colourways can be consolidated.

See the detail

Start a conversation

Bring us a bead you cannot find

Send a reference, a colour chip or a sketch. Minimums are set per design and confirmed per quote; sampling is quoted separately and usually runs 16 to 20 days from an agreed brief.