An Incoterm is not a shipping preference. It decides who pays each leg, who carries the risk at each point, and whose name is on the import entry — which is why two quotes on different terms are not two prices for the same thing.
Beaded décor is normally quoted FOB an Indian port, CIF a destination port, or landed duty paid to a named destination. Landed duty paid means we handle manufacturing, export, freight, duties and US warehousing and quote a single delivered price at your chosen US location, with no separate freight agents, customs brokers or surprise line items.
Quote on the term that puts each obligation with the party best placed to carry it, and never compare two quotes on different terms without normalising them first.
For beaded décor there are three realistic choices. FOB an Indian port, where you take the goods at the rail and run the freight and import yourself. CIF a destination port, where we carry freight and insurance to the port. Or landed duty paid to a named destination, where we handle manufacturing, export, freight, duties and US warehousing and quote one delivered price at your chosen US location.
You state the term and the named place at the request-for-quote stage. We price the legs inside that term. The purchase order repeats the term and the place, and the shipping documents are built to match.
Under FOB, you appoint the forwarder and the entry is filed in your name. Under CIF, we book the ocean leg and you file the entry. Under landed duty paid, we do the whole chain and you receive goods at a dock with one invoice. In every case the term is written as the three letters plus the place, because the place is half the meaning.
Carton design is the part a buyer can still influence, and retail packing is where it is decided.
Which legs are inside the term, and how well each one is run. Freight is the biggest variable, and on a bead load it is driven by cube rather than weight. Duty is the second, and it is driven by the classification and the origin rather than by negotiation.
The third factor is less obvious: who carries the working capital. A landed price includes cost of money across a longer period than an FOB price does, and that is a legitimate part of the difference rather than a margin.
In cross-term comparison. A buyer holds an FOB price from one maker and a landed price from another, sees a large gap, and draws the wrong conclusion. The FOB price has freight, insurance, duty, clearance, inland delivery and in some cases warehousing still to come. Normalising those two to the same term is an afternoon's work and it changes decisions.
The second failure is a term stated without a place. "FOB India" is not a term. There are several ports and they are not interchangeable for cost or transit.
The freight share of landed cost is high, because the goods are bulky and light. That raises the value of getting the term right: a buyer who is good at freight genuinely saves money on FOB, and a buyer who is not genuinely saves money on landed. In a dense, heavy category the difference matters less.
The second difference is classification exposure. Beaded panels sit on a real classification fork between made-up curtains and articles of glass beads, and the importer of record carries that exposure. Under FOB and CIF, that is you. That is an argument for settling the classification before the first shipment regardless of term.
That the landed arrangement exists because of a real capability rather than as a sales line: we manufacture, import and warehouse product in the US. A delivered price at a US location only works when the party quoting it actually holds the US side, and that is what makes one invoice possible instead of an estimate with adjustments.
Our record also shows multi-destination programmes running in parallel, with styles consolidated per destination out of one packing house. Consolidation is what makes the freight element of a landed price defensible.
Name the heading too. HS classification appears on the invoice under every term, and it is the importer's declaration whoever drafted it.
The term and the named place, spelled out. The Incoterms edition you are using, because the rules have been revised and the revisions moved specific obligations. Who is importer of record. Who files which document. Who pays duty, and what happens if the duty differs from the assumption. The insurance basis, if the term includes insurance. And the delivery address or port in full.
An order that says only "DDP" leaves four questions open and will be answered in somebody's favour at the worst possible moment.
Where a landed price is quoted, the duty assumption behind it belongs in writing, and import duty explains how to test it.
Before shipment: the commercial invoice, the packing list, the bill of lading, the certificate of origin where the destination requires one, and any market test or compliance certificate the entry needs. Under landed duty paid those move between us and the clearance; under FOB they move to you and your forwarder.
The classification appears on the invoice. If it is wrong there, it is wrong everywhere downstream, which is why classification is agreed before documents are raised rather than after a load has sailed.
A landed arrangement compresses the number of parties and the number of invoices, and that is a genuine operational saving for a buyer without an import function. It does not compress the obligations — the goods are still cleared and the duty is still paid; the term only moves whose problem it is.
Nothing about a term compresses transit. A faster service is a different freight product, not a different Incoterm.
Three neighbouring pages make a term comparable. HS classification settles the heading the duty attaches to. Import duty turns that heading into a number. Freight and transit explains the leg that varies most, which on beadwork is driven by freight cubing rather than by weight, and retail packing is where that cube is actually decided.
Ask what the landed price assumes about duty, and what happens if the classification is challenged at entry. That single question separates a real landed offer from a bundled estimate. A party quoting landed duty paid is taking a position on classification, and you are entitled to know what it is.
Then ask for the same programme quoted both FOB and landed, once. Comparing those two against your own freight and clearance costs is the only way to know which term suits your business, and the answer is different for a large importer than for a brand with no import function at all.
If a programme mixes constructions, say so: macramé knotting cubes differently from a rigid bead panel, and freight cubing is what the term is pricing.
The term, the named place, the destination markets, and whether you have an import function of your own. The last one decides the answer more often than the arithmetic does.
Also supply your preferred Incoterms edition and any internal trade-compliance requirements, so the documents are built to them from the first shipment rather than corrected on the second.
Extractable data
| Term | Who pays | Where risk transfers | Who is importer of record |
|---|---|---|---|
| FOB, named Indian port | Us to the ship's rail; you from there | On loading at the named port | You |
| CIF, named destination port | Us for freight and insurance to the port; you for clearance, duty and inland | On loading, though we carry cost to the port | You |
| DAP, named destination address | Us to the named place, unloaded | At the named place | You, for duty and import clearance |
| DDP / landed duty paid, named destination | Us for manufacturing, export, freight, duties and US warehousing | At the named place | Us |
| EXW, factory gate | You for everything from the gate | At the gate | You, and you also own export clearance |
Good to know
The number of parties can be compressed. Landed duty paid removes the separate freight and clearance arrangements and replaces them with one price and one accountable party. What cannot be compressed is the obligation itself — somebody still clears the goods and pays the duty, and the term only decides who.
The price under each term, and the named place. We publish what landed duty paid includes; freight and duty rates are quoted per route, because both move with season and classification.
A format or packing change changes the cube, and under any term that includes freight it changes the price. Under FOB it changes your freight cost rather than ours, which is one reason FOB buyers should see the cube figure before approving a packing change.
Choosing a term takes one conversation and should happen before the first quote, not after it. Changing a term after an order is placed is a re-quote, because it moves several legs of cost and the identity of the importer of record.
The term and the named place together — the port, or the delivery address. A request to quote FOB with no port named, or DDP with no destination, cannot be priced.
The term defines what is in the quote, so nothing about it is separate. The thing to watch is what a term does not include: under DAP, for example, duty is still yours even though delivery is ours.
No. Incoterms are indifferent to what is in the carton. The practical difference is cube: knotted work compresses, so the freight element inside a CIF or landed price is smaller for the same piece count.
Keep exploring
Reference
Consolidation, booking and ocean transit after inspection, and why cube rather than weight drives the cost of a bead load.
See the detailManufacturing
The Princeton office, landed duty paid delivery, and the two US rules that decide a bead programme.
Read morePillar
Brief, rough cost sheet, colour match, sample, production, packing — the six stages with the real published timings.
See the detailReference
Made-up curtains against articles of glass beads: the real tariff fork on beaded panels and how the choice is argued.
Specs and sizesReference
The method for establishing duty on beaded décor: classification, the current tariff, trade measures, then a binding ruling.
Read the guide
Start a conversation
Send a reference, a colour chip or a sketch. Minimums are set per design and confirmed per quote; sampling is quoted separately and usually runs 16 to 20 days from an agreed brief.