Reference
Production lead time
40 to 60 days after sample approval for beadwork, 60 to 90 for bohemian and macramé, with sampling in front of both.
How it is madeOrdering · Calendar
Every seasonal failure in this category is the same arithmetic error: planning from the production window alone. This page counts backwards from the floor-set date through every phase, including the ones set per programme.
Count backwards from the floor-set date through five phases: receiving and ticketing, ocean freight, inspection and export packing, production at 40 to 60 days after sample approval, and sampling at 16 to 20 days from an agreed brief. Only the last two have published durations; the other three are quoted per programme and must be counted with your own figures.
Place the order so that sample approval happens at least 40 to 60 days before the goods have to leave India, and then add freight, inspection and your own receiving time on top. For a new design, add the sampling window and your internal approval cycle in front of that.
Only two of the phases in that sentence have published durations. Sampling is usually 16 to 20 days from an agreed brief; production is 40 to 60 days after sample approval for beadwork and 60 to 90 for bohemian and macramé. Freight, inspection scheduling and receiving do not have published figures and are not invented here — you fill them in from your own data.
Start at the floor-set date and walk backwards. Subtract your receiving, ticketing and distribution time. Subtract ocean transit and inland delivery for the route and Incoterm you are buying on. Subtract inspection, export packing and consolidation. Subtract the production window. You now have the required sample-approval date.
For a repeat of an already-approved style, that is the whole count, and it is comfortable. For a new design, keep going: subtract your internal approval cycle and the sample's own transit, then subtract the sampling window, then subtract the time it takes to agree the brief. That last number is the one buyers forget and the one most within their control.
Whether the style is new. A repeat order against a sealed sample removes the entire front half of the count, because there is no brief to agree, no colour to match and no approval to wait for. A new style carries all of it.
Second, whether a colour or a bead has to be made to order. A dye lot or a glass melt sits in front of stringing, and glass colour development can require annealing trials before anyone strings a strand. That is a materials lead time, not a production one, and it is invisible in the published window.
Ask for the required sample-approval date rather than the required order date. That reframes the conversation onto the only milestone that actually controls the production window, and it exposes immediately whether your own internal review cycle fits.
Then ask whether a repeat of an existing approved style could carry the season while a new style is developed for the one after it. In a tight calendar that is almost always the better answer.
Two dates, not one: the floor-set date and the latest acceptable arrival date at your warehouse. They imply different order dates and most briefs give only one. Supply both and the count can be done once rather than renegotiated.
After that, the colour references, because colour is the most common cause of a second sampling cycle and a second cycle is what breaks a seasonal plan.
Brief agreement is buyer-paced, with a reply inside one business day from us. Quotation is 48 hours from a complete specification. Sampling is 16 to 20 days. Photograph approval is same-week if the reviewers are lined up. Sample transit is freight. Internal approval is routinely two to three weeks and is almost never budgeted. Production is 40 to 60 days, or 60 to 90 for knotted work. Inspection, export packing and consolidation are scheduled against the run. Freight is per route.
Order minimums should be confirmed in the same conversation, because a quantity agreed late can reset the schedule.
Sampling, separately. Testing, per market, and commissioned against the approved sample. Inspection and freight, per programme. Compression is agreed per programme rather than bought as a rush service — it is a conversation about what can be parallelised, not a line item.
A seasonal programme does carry one real cost that an evergreen one does not: the cost of being wrong. A missed floor set is usually a markdown rather than a late delivery, which is why the conservative count is the cheap one.
Four neighbours supply the inputs to a backwards count. Sampling and lead times give the two published windows. Freight and transit gives the leg timed from your own freight data, driven by freight cubing. And where a market needs lab testing, that sits on the critical path too, commissioned against the approved sample rather than against the brief.
Three places, every time.
The approval gap. A sample is approved by development, then waits for a buying review, and the window silently starts three weeks late.
A colour amendment after approval. This is a new approval, and on a seasonal style it usually ends the season rather than delaying it.
Freight at peak. Production can finish on schedule and the load can still wait for space. Count freight as its own phase with its own risk, not as a tail on production.
A repeat against an approved tech pack removes the whole front half of the count, which is the only reliable way to hit a tight season.
It is slower at the front and more predictable at the back. The sampling and approval stage is heavier than in a printed category, because a strung panel cannot be fully judged from a drawing. Once a sample is sealed, though, the production window is stable, because the colour-count sheet makes every piece in the run identical by construction rather than by inspection.
The practical consequence is that beadwork rewards early decisions disproportionately. A programme that settles design and colour two months earlier does not finish two months earlier — it finishes with a season's margin instead of none.
That the dates which work are the ones set backwards from a floor set, and that live programmes in our record have carried ship dates agreed months in advance, across multiple styles and destinations, with production scheduled into the following calendar year.
It also shows what happens to a design that arrives late in a buying cycle: it gets costed and re-costed while the window closes around it. Cost engineering works on a drawing, so it has to happen early. Time and cost are the same conversation in a seasonal programme.
Freight and transit is the phase timed from your own freight data, and inspection sits immediately before it.
The ship date and the latest acceptable arrival date, separately. The required sample-approval date for a new style. The inspection window and who attends. The Incoterm, because it determines who is managing the freight phase of your own backwards count. And a stated consequence for a specification change, so both sides already know that a change resets the approval and therefore the season.
Extractable data
| Phase, counting backwards from the floor set | Duration | Source |
|---|---|---|
| Receiving, ticketing and distribution to store | Buyer-side | Your own warehouse figures |
| Ocean freight and inland delivery | Quoted per route and Incoterm | Quoted per programme |
| Inspection, export packing and consolidation | Quoted per programme | Quoted per programme |
| Production — beaded décor | 40–60 days after sample approval | Published |
| Production — bohemian and macramé | 60–90 days after sample approval | Published |
| Sample transit and internal approval | Buyer-side | Your own review cycle |
| Sampling | Usually 16–20 days from an agreed brief | Published |
| Brief agreement and quotation | Reply in one business day; quote within 48 hours of a complete specification | Published |
| Testing, where a market requires it | Quoted per market, against the approved sample | Quoted per market |
Good to know
Yes, by a month at the production stage: 60 to 90 days after sample approval rather than 40 to 60. A shipment combining beadwork and knotted work has to be planned to the longer window, or split into two shipments with two dates.
The brief, the quote turnaround and the number of sampling rounds all compress. Production compresses only by agreement, by running strand sets in parallel. Freight at a seasonal peak does not compress at all, and neither does a dye lot.
Freight transit, inspection scheduling, testing turnaround and any expedite arrangement. Three of the five phases in a backwards count therefore have to be filled in from your own data or from a quote, not from this page.
The clock restarts from the new approval. On a seasonal programme that usually means the season is lost rather than delayed, which is the practical reason to resolve colour and construction before the sample rather than after it.
For a new design, allow the sampling window plus your own approval cycle plus the production window plus freight. For a repeat of an approved style, only production and freight remain, which is why repeats are the only reliable way to hit a tight season.
The floor-set date and the latest acceptable arrival date, as two separate dates. Most briefs give one date and leave us to guess which it is, and the two imply very different order dates.
Sampling is quoted separately from production, and testing is quoted per market. Both are decisions that have to be taken early in a seasonal count, because both sit on the critical path.
Keep exploring
Reference
40 to 60 days after sample approval for beadwork, 60 to 90 for bohemian and macramé, with sampling in front of both.
How it is madeIndex
Seventeen beaded objects documented from inside the craft — what each one is, how the tradition builds it, and what it would take to develop one.
How it is madePillar
Brief, rough cost sheet, colour match, sample, production, packing — the six stages with the real published timings.
Read the guideReference
The five levers that move a bead price, in order of effect, and why cost per square foot does not describe this product.
How it is madeReference
The nine fields a beadwork brief has to carry, what each one is used for, and what happens when one is missing.
Compare the options
Start a conversation
Send a reference, a colour chip or a sketch. Minimums are set per design and confirmed per quote; sampling is quoted separately and usually runs 16 to 20 days from an agreed brief.