Ordering · Inspection

Inspection and AQL: what is checked and what is rejected

Beadwork has its own defect taxonomy, and most of it is invisible in a photograph. First-article and lot AQL inspection run in our own quality and packing house, against the sealed sample rather than against a drawing.

The short answer

Inspection on a beadwork run checks strand count and length, bead sequence against the colour-count sheet, colour against the sealed sample, attachment at the header, hem shape, chipping and knot slip, then the packing. First article and lot AQL inspection run in our own Greater Noida quality and packing house. The acceptance level itself is agreed per programme.

Key takeaways

  • The sealed sample, not the drawing, is the reference inspection works against.
  • First-article and lot AQL inspection run in our own Greater Noida quality and packing house.
  • Colour variance across dye lots is the defect most often missed by an inspection written for textiles.
  • A detached bead is a safety finding on a children's product, not a cosmetic one.
  • The AQL level and the inspection standard are agreed per programme; no level is published.

Which nine things does inspection check?

Inspection on beadwork checks nine things: strand count and length, bead sequence against the colour-count sheet, colour against the sealed sample, knot tension, attachment at the header, hem shape, chipping, the finish on any textile component, and the packing.

First-article and lot AQL inspection run in our own quality control and packaging house in Greater Noida, which also does assembly and kitting, export packing and labelling, and consignment consolidation. The acceptance level and the defect classification are agreed with your programme, and where you have a quality manual of your own, we inspect to it. The defect classification does more to decide the outcome than the acceptance level does.

How does first-article inspection run?

The first pieces off the run are inspected as a first article, against the sealed sample. That check exists to catch a systemic error — a mis-read colour-count sheet, a wrong bead grade, a header fixed in the wrong order — while it is still the first article rather than the whole lot.

Production then runs, with in-line checks at the stringing benches. At the end of the run, a lot inspection samples to the agreed acceptance level: pieces are hung and viewed square, strand lengths measured, sampled strands read bead by bead against the sheet, hems measured, header attachment hand-pulled, and packing verified against the specification. Findings are classified, and the lot is accepted, repaired or rejected.

Which defect classification drives the outcome?

Which defects you classify as critical, major and minor. That classification does more to decide the outcome than the acceptance level does, and it is the part of an inspection specification most often copied from a textile standard without being adapted.

Two examples. Colour variance between dye lots is a minor cosmetic point on a printed textile and a major one on a bead panel, because two panels hanging side by side on a shop floor are directly comparable. A detached bead is a cosmetic point on an adult décor piece and a safety finding on anything age-graded for children, where a freed component becomes a small-parts question.

Which inspection terms belong in the order?

The inspection standard by name. The acceptance level. The defect classification. Who attends and whether a third party is appointed. Whether the sealed sample travels to the inspection. What happens on a failed lot — sort, rework, or reject — and who pays for the re-inspection.

Also write in the colour tolerance, expressed against the sealed sample rather than in words. "Must match" is not a tolerance.

Which inspection documents change hands?

Before the run: your inspection specification and, where appointed, the third-party inspection brief. During the run: the first-article report, which is the one worth reading carefully because it is the only one that can still change the outcome. At the end: the lot inspection report, the packing list, and any market test reports commissioned against the approved sample.

If you only ever read one of these, read the first article.

Can inspection move in-line to the bench?

Inspection can be moved in-line, so checks happen at the bench while a strand can still be re-strung rather than at the end when a panel has to be dismantled. That is genuinely faster and genuinely better.

Re-inspection cannot be compressed. A failed lot has to be sorted, reworked and checked again, and on a seasonal programme that is where the calendar dies. The first-article check is the cheapest insurance in the whole process for exactly that reason.

What did the first article actually find?

Ask what the first article found. Not whether it passed — what it found. A first-article report with no findings on a new construction usually means the check was cursory, and the useful report is the one listing the two or three things that were corrected before the run went to volume.

Then ask how lot-to-lot colour is controlled, because that is the defect most likely to reach your shop floor.

Which sealed sample must you send back?

The sealed sample, back to us or to the inspection, and the inspection specification. Without the sealed sample at the inspection, colour and hand are being judged from memory.

Supply also the packing and label artwork in good time. A large share of inspection findings in any home category are packing and labelling findings rather than product ones, and those are entirely avoidable.

How long does a lot inspection take?

The first article is a short check on a few pieces, run as soon as the first pieces exist. The lot inspection is scheduled against the run. Neither has a published duration, and both sit outside the published 40-to-60-day production window along with export packing and consolidation.

If a plan treats inspection as free time, it is a plan with a missing phase.

What is charged for inspection?

Our own first-article and lot AQL inspection is part of how the network is run and is not presented as an extra service. A third-party inspection you appoint is quoted by that party, and a re-inspection after a failure is a real cost that the inspection specification should allocate in advance.

Testing is separate again. Inspection proves the goods match the sample; a test report proves the sample meets a standard. They are not substitutes, and a buyer asking for "QC" sometimes means one and sometimes the other.

Three neighbours carry the detail. First article inspection has its own glossary entry. Pull testing is the one check that becomes a safety question rather than a cosmetic one. And the colour-count sheet is the document an inspection should read, because it is the cause of the uniformity a panel is being measured for. The stringing medium and the panel headers are where the findings usually are.

Why do buyer and maker disagree on tolerance?

On tolerance. A buyer and a maker can agree every value in a specification and still disagree about how close is close enough on colour, on hem shape and on strand drift. The resolution is physical: the sealed sample, with the tolerance expressed against it, at the inspection.

The second place is a defect list written for a different product. A strung panel inspected to a curtain standard gets checked for seam strength it does not have, and not checked for knot slip, which is the thing that actually fails.

Why is hand-built variance distributed, not systematic?

Every unit is hand-built, so variance is distributed rather than systematic. In a machine category a fault is usually in the setup and therefore in every piece; in beadwork a fault can be in one bench's output on one day. That changes what an inspection is for: it is looking for variance across the lot as much as for conformity to the sample.

It also means the colour-count sheet is the real quality document. Strand lengths are identical across a run because the sheet makes them identical, and a pattern repeats exactly for the same reason. An inspection that reads the sheet is checking the cause; one that only measures the panel is checking the symptom.

Extractable data

The beadwork defect taxonomy

Defect types specific to strung and embroidered beadwork. Whether a given defect is a reject or a repair is agreed per programme in the inspection specification, and the column below states our working view.
DefectHow it is detectedReject or repair
Strand driftStrand lengths measured against the sealed sample; the panel hung and viewed squareRepair at the header; reject if the colour-count sheet was mis-strung
Bead sequence errorStrand read against the colour-count sheet, bead by bead on a sampled strandReject — the pattern will not repeat across the run
Colour variancePanel compared to the sealed sample, and lot compared to lotReject if outside the agreed tolerance; this is the most common real finding
Bead chippingVisual at the accent beads and at the hem, where knocking happensReject the piece; investigate the bead if it recurs
Knot slipHand tension at each strand end and at the header fixingReject — a slipped knot sheds beads in use
Attachment failure at the headerHand pull at the dowel, header rail, rod pocket or suspension loopReject
Hem shape out of specificationLongest and shortest drop measured against the sampleRepair where strands can be re-ended; otherwise reject
Packing and label errorCarton count, inner packing, label and barcode against the specificationRepack

Good to know

Questions buyers ask about Beadwork inspection and AQL

How long does this stage take?

Inspection is scheduled against the run rather than run to a published duration, and it happens in our own Greater Noida quality and packing house alongside assembly, kitting and export packing. Build it into the plan as its own phase, not as a tail on production.

What do you need from us first?

The inspection specification: the acceptance level you want applied, the defect classification you use, whether you or a third party attends, and whether the sealed sample travels to the inspection. It should travel; an inspection against a photograph is not an inspection.

Is this quoted separately?

First-article and lot AQL inspection in our own quality house is part of how the network runs. A third-party inspection you commission is yours to arrange and pay for, and we schedule the run around it.

Does it differ for macramé?

The taxonomy changes. Knot consistency, cord tension, fringe length and frame alignment replace strand drift and bead sequence. Colour variance remains, because dyed cord has lots in the same way dyed beads do.

What can be compressed, and what cannot?

Inspection can be run in-line rather than only at the end, which spreads it across production instead of concentrating it. What cannot be compressed is a re-inspection after a failed lot, which is why the first-article check exists at all.

What is confirmed per quote rather than published?

The AQL level and the defect classification. Both are agreed with your programme, and where you have a quality manual of your own we inspect to it. The defect classification does more to decide the outcome than the acceptance level does.

Keep exploring

Related pages

Start a conversation

Bring us a bead you cannot find

Send a reference, a colour chip or a sketch. Minimums are set per design and confirmed per quote; sampling is quoted separately and usually runs 16 to 20 days from an agreed brief.