Reference
HS 7018
Made-up curtains against articles of glass beads: the real tariff fork on beaded panels and how the choice is argued.
See the detailOrdering · Duty
A duty rate only exists once the classification is settled, and you should distrust anyone who quotes one before that. Rates change and trade measures layer on top of them, so this page gives the method that produces a number you can rely on.
Establish duty in four steps: settle the classification for the finished construction, read the rate in the current tariff of the destination country for that heading and origin, check for trade measures and any preference programme layered on top, then request a binding ruling if the position is arguable. No rate is published here, because a published rate goes stale and a stale rate is a liability.
We will not print a rate. Three reasons, all of them practical.
A duty rate depends on the classification, and beaded décor sits on a real classification fork rather than in one obvious heading. A rate depends on the destination's current tariff, which is revised. And a rate sits under whatever trade measures, remedies or preference programmes are in force at the moment of entry, which move independently of the tariff itself and faster than any website is updated.
A published rate would therefore be right for one construction, into one country, on one date. Everywhere else it would be a trap. The method below is durable; a number is not.
Settle the classification first, on the finished construction, with the material breakdown behind it. Read the base rate in the destination's current tariff for that heading and that origin. Then check what is layered on top: additional duties, trade remedies, and any preference programme the origin might qualify for. Finally, if two headings are genuinely arguable, apply for a binding ruling from the authority rather than choosing the cheaper one and hoping.
Record the result in the order as an assumption, with an allocation if the rate at entry turns out different. That last step costs nothing and settles arguments before they happen.
Classification and origin, in that order, then whatever is layered on top.
Classification is where beadwork is unusual: a range can legitimately classify in more than one place depending on whether the body is glass, plastic or wood and whether there is a textile ground. Origin is straightforward for us — everything is made in our own Indian plants — but it still has to be evidenced where a preference programme is claimed.
That the duty question arrives at the same time as the testing question, because both are triggered by the finished construction rather than by the design. Programmes in our record that handled market entry well settled classification, testing and marking together, once, before the first shipment, and then repeated the same position across reorders.
It also shows that incremental market costs — testing in particular — get spread across the units of an order rather than charged to a first shipment. Duty does not work that way: it lands per entry, every time, which is why a wrong assumption compounds.
The declared heading rests on the bead materials in the build, so the material breakdown is part of the duty file rather than an attachment to it.
The classification to be declared. The duty assumption used in the price. Who is importer of record. Who bears a difference if the authority rules otherwise. And, where a preference programme is claimed, who holds the evidence of origin.
A purchase order that names a landed price but no duty assumption has not actually allocated the risk; it has just not mentioned it.
Where the goods are children's goods, the certificates of compliance travel with the same entry and are worth preparing together.
Before shipment: the material breakdown, the classification, and any ruling obtained. At shipment: the commercial invoice carrying the declared classification, the packing list, the bill of lading, and the certificate of origin where required. At entry: the entry itself, filed by the importer or its broker.
If the goods move under landed duty paid, those documents move through us, but the position they declare should still have been shown to you in writing.
Compressible: the time to read a tariff, and the time to produce a material breakdown.
Not compressible: a ruling, and a correction. A binding ruling runs on the authority's clock. A correction after a challenged entry runs on the authority's clock plus storage, plus whatever the delay does to your floor set. The asymmetry between those two and the afternoon it takes to do the work properly is the whole argument of this page.
Read this with two neighbours. HS classification comes first, because the rate attaches to a heading rather than to a product name. Incoterms come second, because the term decides whether the duty is yours or ours. And where a landed price is quoted, freight and transit is the third input, since a bead load prices on freight cubing rather than on weight.
Ask, in writing: what classification does this price assume, what duty rate does it assume, and what happens if the authority disagrees. Three sentences. The quality of the answer tells you most of what you need to know about who you are dealing with.
Then ask whether a ruling exists for a comparable construction. A ruling in the public record for a similar article is useful even when it is not yours.
The destination, the Incoterm, and whether you have an import function of your own. If you do, this page is a checklist for your own team. If you do not, it is the list of things to require from whoever is doing it on your behalf.
Also supply your trade-compliance policy if you have one, because large importers often have internal classification standards that must be followed regardless of what a factory proposes.
On a seasonal programme, fold this into the seasonal calendar rather than treating it as a shipping task.
Classification opinion: days. Tariff reading: same day. Trade-measure check: same day, but it has to be repeated near the shipment date, because measures change. Ruling: months.
The only step that genuinely needs repeating is the trade-measure check. A rate confirmed six months ago and not rechecked is the most common way a landed cost moves without anyone deciding to move it.
On an assumed rate inside a landed price, discovered at reconciliation. And on a classification applied across a whole range when the range spans materials.
A third, quieter failure: claiming a preference programme without the evidence of origin to support it. The benefit is real but the evidentiary burden is on the importer, and an unsupported claim is worse than no claim.
Extractable data
| Step | Who does it | What it produces |
|---|---|---|
| Settle the classification | Importer, with the maker supplying the material breakdown | A heading, with the construction facts it rests on |
| Read the current tariff | Importer or its customs broker | The base rate for that heading and origin, as it stands today |
| Check trade measures and preferences | Importer | Any additional duty, remedy or preference programme in force |
| Request a binding ruling, if arguable | Importer | A written position from the authority, relied on at entry |
| Record the assumption in the order | Both parties | An agreed allocation if the rate differs at entry |
Good to know
A construction or material change can move the classification, and a moved classification can move the rate. This is the main reason a late design change shows up as a landed-cost surprise rather than as a unit-price one.
Reading the tariff is same-day work. A binding ruling takes as long as the authority takes and cannot be hurried by urgency, so it belongs in the season before the one that needs it.
The destination market, and whether you or we are importer of record. Under landed duty paid the duty assumption is ours to carry; under FOB or CIF it is yours, and so is the exposure if it is wrong.
Duty is inside the price under landed duty paid and outside it under FOB and CIF. A ruling application is the importer's own exercise. Nothing about duty is a factory service, which is why the method matters more than the number.
Yes, because the classification differs. A hand-knotted cotton piece is a textile article and sits in a different part of the tariff from a glass-bead one, with its own rate and its own trade-measure exposure.
Tariff reading compresses to an afternoon. A ruling does not compress at all. Neither does the correction of a wrong entry, which is slower and dearer than getting it right once.
The duty assumption inside a landed price. Ask for it in writing. A delivered price that will not state its classification and duty assumption is an estimate wearing a price tag.
Keep exploring
Reference
Made-up curtains against articles of glass beads: the real tariff fork on beaded panels and how the choice is argued.
See the detailPillar
Brief, rough cost sheet, colour match, sample, production, packing — the six stages with the real published timings.
Read moreManufacturing
The Princeton office, landed duty paid delivery, and the two US rules that decide a bead programme.
View the rangeReference
A blank request-for-quote sheet and a bead tech pack template, field by field, usable with any maker.
See the detailReference
What FOB, CIF and landed duty paid each cover, where risk transfers, and why cross-term quote comparisons mislead.
Specs and sizes
Start a conversation
Send a reference, a colour chip or a sketch. Minimums are set per design and confirmed per quote; sampling is quoted separately and usually runs 16 to 20 days from an agreed brief.