Glossary
The glossary
The words a bead tech pack uses, defined one term to a page so a specification can cite them.
See the detailGlossary
The checkpoint that costs a day and saves a run. On hand-strung work it is the only inspection that can still change anything.
First-article inspection checks the opening pieces of a production run against the approved sealed sample and the colour-count sheet before the balance is made. On hand-strung beadwork it is the last point at which a drifted pattern, a wrong drop or a mismatched dye lot can be corrected without remaking finished panels. Our Greater Noida house carries it out.
First-article inspection takes the opening pieces of a production run — the first panels, the first coasters, the first hangings — and checks them against two documents: the approved and sealed sample, and the colour-count sheet the bench is working from.
The point of it is timing. It happens while there is still a run left to correct. Everything that gets checked afterwards is checked on product that already exists.
In the quality clause, beside the sealed-sample reference. The clause should name the values being verified, not just require an inspection: the pattern read against the colour-count sheet, the longest and shortest drop, the strand pitch at the header, the colour against the sealed sample, and the header construction.
A clause that says only "first article inspection required" leaves the scope to the maker, which usually means the fastest version of it.
Because hand-strung work drifts, and it drifts systematically rather than randomly. If a beadworker has misread one strand sequence, every panel they string will carry the same error. A statistical lot inspection at the end will find it, and by then it is in the whole lot.
First article catches the systematic error while it is still one panel. That is the whole economic argument: one day of inspection against several hundred panels of rework.
Position by position on selected strands, not by eye against a photograph. The inspector reads a strand off the sheet and counts it on the panel. Then the drops are measured, the pitch is measured at the header, and the colour is compared to the sealed sample under consistent light.
Inside our own network this runs through the Greater Noida house, which does first-article and lot inspection, assembly and kitting, and export packing and labelling for the group.
The run gets inspected at the end, as a lot. That is still an inspection and it still finds faults; it just finds them at the point where the options are rework, discount or acceptance, rather than at the point where the options include "re-brief the bench and carry on".
The checks change. On strung beadwork the first article is about sequence, drop and pitch. On bead embroidery it is about stitch density, ground tension and whether the motif sits square on the ground. On linked faux-capiz work it is about disc colour consistency across the lot and whether the columns lie flat.
The principle holds everywhere: the first pieces are the cheapest place to find out you are building the wrong thing.
The buyer writes the requirement and the scope. The maker performs the inspection and issues the record. Where a buyer wants to witness it, that has to be agreed in the programme, because it adds a hold point and therefore time.
The buyer-side decision worth making deliberately is whether first article is a hold — production stops until it is passed — or a notification. On a first run of a new design, a hold is usually worth the days.
From engineering and defence manufacturing, where first-article inspection is a formal, documented comparison of the first production part against the drawing. It travels into soft goods and décor with its logic intact and its paperwork simplified.
The word article rather than piece is the engineering inheritance, and it is why the term reads oddly in a textile context while meaning exactly the right thing.
Check the first ones before you make the rest.
Sample approval, which happens earlier and against a brief rather than against a run. Lot inspection, which happens later and samples statistically. Pre-shipment inspection, which checks packing, labels and counts rather than construction.
All four belong in a quality clause, and they are four separate things. A purchase order that names only one has left three gaps.
Scope and hold status, not quantity. The inspection quantity, the acceptance level and the defect allowance are agreed per programme and written into the order.
What is published is the outcome across the group: product issue rates running at a fraction of a percent. That is a result, not an acceptance criterion, and it should not be quoted as one.
The colour-count sheet entry, because the sheet is the document first article is read against, and the stringing specification sheet, because the drops and pitch it carries are what get measured.
The dyed-to-match entry is the other one: a base bead dyed to an accent is checked here, on the first pieces, under the light the sample was approved under.
Extractable data
| Field | Value |
|---|---|
| Term | First-article inspection |
| Also written | First article; FAI; first-piece inspection |
| One-line definition | The opening pieces of a run, checked against the sealed sample before the rest is made |
| Where it appears | The quality clause of a tech pack or purchase order |
| Confused with | Lot AQL inspection, pre-shipment inspection, sample approval |
| Who states it | The buyer, as a quality requirement; the maker performs it in its own inspection house |
Good to know
In the quality clause, alongside the sealed-sample reference and the lot inspection standard. It should name what is being checked — pattern against the colour-count sheet, longest and shortest drop, pitch at the header, colour against the sealed sample — rather than simply requiring that an inspection happens.
Lot inspection, which samples a finished batch statistically and happens too late to change the build, and sample approval, which happens before production starts. First article sits between them, on the first pieces off the bench.
The useful specification is which values are checked and against which document, not a quantity. Inspection quantity and acceptance level are agreed per programme and written into the order. Across the group the published position is that product issue rates run at a fraction of a percent; that is an outcome statement, not an inspection limit.
The run is inspected as a lot, at the end. On hand work that is the expensive order of operations: a pattern that drifted on strand nine of thirty is discovered after several hundred panels have been strung, and the only remedies left are rework or acceptance.
Checking the first pieces of a run against the sealed sample, before the rest of the run is made.
Keep exploring
Glossary
The words a bead tech pack uses, defined one term to a page so a specification can cite them.
See the detailSpecification
Diameters, drill holes, cord selection, strand counts and format dimensions — the sheet to copy into a tech pack.
Read moreGlossary
The finished length of a strand — and why a shaped hem needs the longest and the shortest drop, not a hem name.
See the detailGlossary
The last bead on a strand: it closes the cord, finishes the hem, and weights a light strand so it hangs straight.
Read the guideGlossary
The historical name for a curtain hung at a doorway — and why the word still earns its place on a brief.
Compare the options
Start a conversation
Send a reference, a colour chip or a sketch. Minimums are set per design and confirmed per quote; sampling is quoted separately and usually runs 16 to 20 days from an agreed brief.