Specification
A beadwork specification
The dimensions, strand values, fixings and performance limits a drawing and schedule have to carry.
View the rangeSpecification · Performance
Beadwork is a visual and spatial device, not an acoustic one. This page exists so that a specifier can say that with confidence, and knows what to specify instead.
A hanging bead panel does not meaningfully reduce noise. It has almost no mass per unit area, it is not airtight, and it has no absorbent surface, so it scatters a little high frequency and transmits everything else. Where acoustic separation is a requirement, it has to be met by a door, a glazed screen or an absorbent product.
Whether to let a bead panel appear in an acoustic conversation at all. The useful decision is to take it out of that conversation early, because it cannot contribute, and to specify something that can.

What remains is a secondary decision that is worth making deliberately: what sound the panel itself makes when it moves.
| Value | Unit or option | Note |
|---|---|---|
| Acoustic role | Visual and spatial, not acoustic | Name the element that meets the acoustic requirement |
| Absorption | Minimal | A hard bead surface absorbs very little at any frequency |
| Mass per unit area | Low at any pitch | Sound reduction needs mass; a strung panel has little |
| Airtightness | None | Gaps between strands are the construction, not a defect |
| Bead sound character | Glass: bright chime | Audible when the panel moves |
| Bead sound character | Acrylic: light click | Quieter than glass |
| Bead sound character | Wood: soft knock | Softest of the strung materials |
| Bead sound character | Bamboo: dry rattle | Most audible movement sound for its weight |
| Where acoustics are required | Door, glazed screen or absorbent panel | Specified in addition to, not instead of, the beadwork |
Name the element that meets the acoustic requirement, and note that the beaded element is decorative. That one line is what protects the project.
That sentence protects the project. Without it, a bead panel at an opening between two zones gets quietly counted as separation in a design review.
Ask what the acoustic requirement actually is. If it is a regulatory separation, a privacy requirement in a consulting room, or a noise target between zones, specify a door, a glazed screen or an absorbent panel and let the beadwork be decorative.
If there is no acoustic requirement and the question is only whether beads help, the answer is that they help the perception of separation and not the measurement of it.
It does not change what the panel does to sound. The only link is that dust between beads slightly damps the contact noise when the panel moves, which is a real effect and far too small to specify.
What maintenance does affect is the bead-on-bead sound over years: a glass panel that has lost a few end beads to breakage sounds different from a complete one.
Sound reduction requires two things: mass and an airtight seal. A bead panel has very little mass per unit area even at the densest pitch, and it is full of gaps by construction. A doorway with a bead panel in it is, acoustically, an open doorway.
The audible change is real but it is a change in character, not in level. High frequencies scatter off hard bead surfaces and the sound through the opening is marginally less direct. Nobody will measure that and no occupant will describe it as quieter.
Our largest installation reference is the beaded décor walls at a US casino resort, and that is a visually and spatially driven application rather than an acoustic one. The same is true across the shipped programme: beadwork is specified for how a space reads.
Specify it that way, let the door or the absorbent panel carry the acoustic requirement, and the beadwork does the thing it is good at.
A line naming the element that meets the acoustic requirement, so a facilities team inheriting the space knows which part of the opening does the work and which part is decorative.
Where an acoustic element was installed alongside, its own test data belongs in the pack with the standard and the laboratory named.
It changes the sound the panel makes, not the sound it stops. Glass gives a bright chime. Acrylic gives a light click. Wood gives a soft knock. Bamboo gives a dry rattle.
In a busy retail entrance none of that registers. In a quiet treatment room, a yoga studio or a bedroom it is the most noticeable acoustic property of the installation, and it is the one actually worth specifying. A glass panel in a silent room is a loud object.
None applies, because there is no acoustic value to tolerance.
Treat any approximate sound reduction index offered for a hanging bead panel, by anyone, as a number to reject. A specifier who lets one into an acoustic strategy can fail a test on a real building.
By letting the acoustic element lead. A door, a screen or an absorbent panel has a fixing requirement that cannot be compromised; the bead panel can almost always be moved, dropped from a secondary line, or hung in front of the acoustic element rather than instead of it.
That last arrangement is common and works well: the acoustic element does the work and the beadwork does the appearance.
The schedule carries the bead panels per opening. The acoustic element is a separate schedule item with its own specification, its own test data and its own supplier.
Keeping them as two items on the schedule is what stops them being read as one product with combined properties.
When a bead panel was specified into an opening that an acoustic strategy depended on. The panel is installed, it performs exactly as beadwork performs, and the acoustic target is missed by the whole amount the strategy had assigned to that opening.
That failure is designed in, months before installation, and the only reliable prevention is the sentence on the drawing that says the beadwork makes no acoustic contribution.
Good to know
The sound the panel itself makes. Hang a section in the specified material and move it: glass chimes, acrylic clicks, wood knocks and bamboo rattles. In a quiet treatment room that difference matters more than any transmission figure, and it is the one acoustic property genuinely worth specifying.
It does not change performance. It does change the movement sound slightly, because dust between beads damps the contact noise. That is a real but trivial effect and should not appear in a specification.
Sound reduction requires mass and an airtight seal, and a bead panel has very little mass per unit area and is full of gaps by construction. The audible change across one is a shift in high-frequency character rather than a reduction in level.
If an acoustic element is specified alongside the beadwork, its fixing takes priority at the head of the opening and the bead panel is coordinated around it. A bead panel is the easier of the two to relocate.
A line naming the element that meets the acoustic requirement, so a future facilities team knows which part of the opening does the work. Where an acoustic element was installed alongside the beadwork, it belongs in the pack with its own test data, standard and laboratory named.
Where acoustics are a project requirement, the drawing should name the element that meets it and state that the beadwork does not contribute. That one sentence prevents the bead panel being counted towards an acoustic target in a later design review.
Keep exploring
Specification
The dimensions, strand values, fixings and performance limits a drawing and schedule have to carry.
View the rangeSpecification
Ceiling fixing, double-sided reading, strand drift in airflow, and a plain account of what a bead division will not do.
See the detailSpecification
How pitch, diameter and opacity combine into a sightline — and the distance at which concealment stops working.
Read the guideSpecification
How transmission, refraction and cast bead-shadows behave through the day — and where glare control fails.
Compare the optionsSpecification
Air passes, insects are discouraged rather than excluded, and pitch is the only lever that changes either.
Specs and sizes
Start a conversation
Send a reference, a colour chip or a sketch. Minimums are set per design and confirmed per quote; sampling is quoted separately and usually runs 16 to 20 days from an agreed brief.