Craft topic
Bead partitions and portieres
The portière, the screen and the divider — three different jobs that look alike in a photograph, and which of them we actually build.
See the detail
Application · Application
A hanging division is read from both sides, moves in the room's airflow, and does nothing whatsoever for sound. Two of those are design opportunities. The third is the one clients are surprised by.
A wide hanging divider of close-strung faceted silver and pale blue glass beads, each bead catching a small crisp highlight.
Hanging beadwork zones an open plan visually: it marks a boundary, carries light between two areas and reads as a surface from both sides. It is a visual and spatial device, not an acoustic one. A beaded division is drawn in the design library and available to develop rather than a current range, so it starts with a brief and a sample.

Mark a boundary without building a wall. The client wants the dining area to feel separate from the sitting area, or the entry to stop opening directly onto the kitchen, and they do not want to lose the light or the volume that made the open plan worth having.
Beadwork is one of the few materials that does that honestly. It occupies a plane, it catches light, it moves when someone walks past — and you can still see through it. What it does not do is make the room quieter: there is no noise reduction to be had from a hanging panel, and that is the conversation to have in the first meeting.
A design that works from both sides. A wall-mounted panel has one face. A division has two, and a bead map with a directional motif will read wrong from one of them.
Stillness, or at least self-ordering. A division hangs in moving air.
A clear way through, if there is one. If people cross the line, the design needs a gap, an arch or a planned parting point.
Honesty about what it is not. Not acoustic, not privacy, not a fire barrier.
Our recommendation is a run of shipped formats rather than one bespoke divider: door curtains at about 90 × 200 cm, or portals at 76 × 140 cm, hung side by side from a continuous rail. Each module is a construction we make routinely, each can be lifted down to clean, and a damaged one can be swapped.
The design library does contain divider formats — 90 × 180 cm and 120 × 180 cm, with a strand count up to sixty — but those are renders. No beaded room divider has been sampled or shipped by us.
Material: body-coloured glass, for the weight. Heavier strands drift less. Acrylic, wood and bamboo all work visually and all need a weighted end bead in a draughty position.
Area, as always, and here the area is large: a division is usually wider than any doorway in the building. Expect bead count to be the dominant number.
The cost levers in order: bead size and material, then strand count and tightness, then pitch, then the rail and packing, then height. Zoning has one lever the other settings do not — you can specify a division that is deliberately not full height. A division that stops 600 mm short of the floor still reads as a boundary, still carries light, and costs materially less. Minimums and pricing are set per design and confirmed with your quote, and a rough cost sheet comes before any sample.
Not as a single-piece divider: that is a craft category rather than a Gemixx range, and the design library carries divider sizes as drawings available to develop.
What is settled is the component formats — portals, curtains, café curtains, valances and wall hangings, in continuous production. A division assembled from those is a specification we can stand behind.
Specifying beadwork as acoustic treatment. It is a visual and spatial device, not an acoustic one. If the brief is acoustic, specify a product that works and let the beadwork hang in front of it.
Also: a single bespoke wide divider where a run of modules would do. A directional pattern on a double-sided division. Light beads in a draught with no end weight. And a division across a required escape route, which is a question for the project's authority having jurisdiction and not one we can answer.
The designer, and the person who will walk through it forty times a day. In a home that is the client; in an office or a restaurant it is the operator.
Add the structural trade if the division is ceiling-hung, because the fixing goes into structure rather than into a ceiling finish. Our sign-off is the sample, and for a division it is worth sampling two adjacent modules so the joint between them can be judged.

A ceiling-hung division puts its whole weight on one line. That line is a joist-fixed rail or a proper track, designed and supplied by the project — not a plasterboard fixing and not a suspended-ceiling grid.
We make the bead-side header rail the strands are knotted to, and we give the measured panel weight of the approved sample. The panel is weighed on the approved sample and the fixing is sized to that weight. An arithmetic estimate is not a substitute for it.
Domestically, usually none. In a commercial open plan, three things come up.
Flammability. A free-hanging decorative division in a commercial interior will normally be asked to meet NFPA 701 in the US or the local equivalent. Fire performance is tested on the specified build and quoted with the project.
Egress. A division in the middle of a floor plate interacts with escape routes, and that question belongs to the project's authority having jurisdiction. Settle it before the line of the division is fixed.
Acoustics. Fit-out specifications sometimes ask for an acoustic performance figure on a partition. Beadwork is a visual and spatial device, not an acoustic one, so that figure has to come from the element doing the work.
Both faces, dry, down each strand from header to hem, quarterly in most open-plan positions. Damp spot-cleaning of the beads where needed, cloth wrung nearly dry, dried in the same pass, cord kept dry.
Design for module removal. A division built as modules can be taken down one at a time and cleaned at floor level, which is the only version that stays properly maintained for years. A single fixed wide divider can only ever be dusted in place.
Strand order, from airflow. This is the distinguishing failure of a division and it surprises people: there is no traffic wear, no grease, no sunlight, and yet after a year the strands no longer hang as a plane. Air from a diffuser or a stair does it.
Weight is the answer — a denser bead, a weighted end bead, a slightly wider pitch. After that, dust on both faces, and over years the usual slow cord slackening that shows as an uneven hem.
Sampling 16 to 20 days from an agreed brief, photographs approved first; production 40 to 60 days after sample approval. That applies to a division built from shipped formats. A bespoke single-panel divider is development work and needs a development phase in front of those numbers, with the build, the fixing interface and any flammability testing each quoted separately. Formal quotes follow within 48 hours of a specification, after a discovery call on anything multi-module.
Bead materials, the stringing specifications a division is drawn against, and the beaded curtains it is assembled from are each covered on their own pages.
Extractable data
| Item | Position | Note |
|---|---|---|
| Product status | Available to develop | Drawn in the 2027 library; starts with a sample |
| Library format | 90 × 180 cm and 120 × 180 cm, up to 60 strands | From the current design library |
| Shipped alternative | Door curtain ≈90 × 200 cm; portal 76 × 140 cm | Hung side by side to make a run |
| Reading | Both faces visible | Bead map designed to work from either side |
| Pitch | Wider than a doorway if people pass through | Tight pitch interlocks under traffic |
| Bead material | Body-coloured glass for weight and stillness | Heavier strands drift less in airflow |
| Light bead caution | Acrylic, wood and bamboo drift in draughts | Add a weighted end bead |
| Top fixing | Ceiling track or joist-fixed rail, by others | We make the bead-side header rail |
| Acoustic performance | No data held | A bead division does not reduce sound transmission |
| Fire | Tested on the specified build and quoted with the project | NFPA 701 or the local equivalent |
| Egress | No approval held | A division across an escape route is an AHJ question |
| Sampling | 16–20 days from an agreed brief | Photographs approved before the sample ships |
| Production | 40–60 days after sample approval | Published lead time for beaded décor |
Good to know
Dry dusting down each strand, header to hem, on both faces — which is the extra work a division creates compared with a wall-mounted panel. In an open plan it collects less than a kitchen doorway and more than a closet front, so quarterly is usually realistic. Damp spot-clean the beads with the cloth wrung nearly dry, and keep the cord out of the water.
Sampling is 16 to 20 days from an agreed brief, with photographs approved before the sample ships, and production is 40 to 60 days after sample approval. A single-piece divider is a development, so allow a development phase in front of those figures. Running a division as several door-curtain panels side by side avoids that entirely, because those formats are already in production.
Strand order, driven by airflow rather than by traffic. A division sits in the middle of a room where air moves — from an HVAC diffuser, an open door, a stair — and light strands drift out of line and stay there. The fix is weight: a heavier bead, a weighted end bead, or a slightly wider pitch so adjacent strands are not touching.
Not as a single bespoke divider — that is a craft category rather than a Gemixx range, and the design library carries divider sizes at 90 × 180 and 120 × 180 cm as drawings available to develop. What we make and ship in quantity is door curtains, portals, café curtains, valances and wall hangings, and a division built from those formats hung side by side stands on that production record.
The answer is several shipped panels rather than one bespoke divider. A run of door curtains at around 90 × 200 cm, or portals at 76 × 140 cm, hung side by side from a continuous rail, gives a division whose construction is already proven and whose modules can be handled and cleaned one at a time. A single wide divider is possible and is development work.
It fixes into structure, not into a suspended ceiling tile. A joist-fixed rail or a proper ceiling track, designed and supplied by the project, carries the whole load along one line. We make the bead-side header rail the strands are knotted to, and we supply the measured finished weight of the approved sample so an engineer can size the support. The panel is weighed on the approved sample and the fixing is sized to that weight.
Keep exploring
Craft topic
The portière, the screen and the divider — three different jobs that look alike in a photograph, and which of them we actually build.
See the detailPillar
Twenty settings, from a closet front to a hotel lobby, each with the format that suits it, the fixing it needs and the standard that applies.
Compare the optionsSpecification
A hanging bead panel scatters a little high frequency and reduces nothing meaningfully — and what to specify instead.
See the detailSpecification
Walk-through wear, strand drift, header load and the frame-to-panel gap — what a doorway in constant use demands of a bead panel.
Read the guideSpecification
Daylight and fade, sill-set lengths, the fabric header with a rod pocket, and why a window brief is a light brief rather than a privacy one.
Compare the options
Start a conversation
Send a reference, a colour chip or a sketch. Minimums are set per design and confirmed per quote; sampling is quoted separately and usually runs 16 to 20 days from an agreed brief.