Minimums: why they are set per design

Minimums are set per design and confirmed with your quote. This page explains what actually sets one, so you can predict roughly where yours will land before you ask.

The short answer

Minimums are set per design and confirmed with your quote, because a plain-strand panel and a fully patterned panel of identical dimensions use very different amounts of material and stringing time. Four things set a minimum: bead availability, dye-lot size, tooling where a custom bead is needed, and whether colourways can be consolidated. A general figure across the category would be too high for one and meaningless for the other.

Key takeaways

  • Minimums are set per design. Any number quoted as a general Gemixx minimum is not ours.
  • Minimums are set per design and confirmed per quote.
  • Four drivers: bead availability, dye-lot size, tooling cost, and colourway consolidation.
  • Consolidating colourways across destinations is the most reliable way to bring a minimum down.
  • Ask for the minimum in the same message as the price. They move together.

How is a minimum order quantity set?

Per design, and confirmed with your quote. It is set against the construction you actually specify rather than across the category.

That is the only way it can work, because the thing a minimum protects against — a run too small to be worth setting up — is a function of the design rather than of the category. A plain-strand panel and a fully patterned panel at the same dimensions use very different amounts of material and stringing time. One number across both would be too high for the first and too low to be meaningful for the second.

If you are ever quoted a general Gemixx minimum as a fixed figure, it did not come from us.

How is a minimum actually confirmed?

You send the specification with the quantity split by colourway, and say whether colourways or destinations can be consolidated. We check whether every bead in the design is already in the working library, whether any colour needs dyeing or melting to order, and whether any shape needs a die. Those three checks produce the floor.

The minimum then comes back with the price, in the same document, because the two move together. A quantity below the floor is not refused silently; it comes back with the two or three changes that would bring the floor down to meet it.

Which four things set the minimum?

Four things, and only one of them is about us.

Bead availability. The working library is deep in all nine bead families, and a design built from library beads carries almost no setup burden. A design needing a bead that does not exist yet carries a drawing or moulding step, and that step has a volume behind it.

Dye-lot size. A colour dyed or melted to order arrives as a batch. The batch does not get smaller because the order is small.

Tooling. A custom bead needs a die, and the die is a one-time cost recovered against the run.

Consolidation. Two destinations ordering the same colourway are one production run. That single fact has moved minimums further than any other argument.

Which quantity information must you send?

From you: the specification, the quantity per colourway, and a statement on whether consolidation is possible. From us: the quote carrying the minimum, and where the quantity sits below the floor, the list of changes that would move it.

If a programme proceeds, the purchase order should state the quantity per colourway and the consolidation assumption explicitly. A minimum agreed on the basis of a consolidated run and then shipped as separate runs is a different commercial deal.

Which part of a minimum can be reduced?

Compressible: the number of distinct colourways, the number of distinct beads, and the split across destinations. Each of those is arithmetic, and arithmetic can be argued with.

Not compressible: a dye lot, and the recovery of a die. Those are physical and financial facts about making a bead that did not previously exist. A buyer who wants a custom bead at a very low quantity is really asking who absorbs the tooling, and that is a negotiation worth having openly rather than through the minimum.

Which three questions get you a minimum?

Ask three things in one message. What is the minimum for this specification. What would it be if the colourways were consolidated into one run. And which single design change would bring it down most.

Those three answers together tell you whether the programme exists at your volume. Asking only the first gets you a number with no handles on it.

Why send quantity per colourway, not a total?

Quantity per colourway, not a total. This is the most common error in incoming briefs and it is quietly expensive: a brief whose total is split across colourways is one run per colourway, and the minimum applies to the run rather than to the order.

Also tell us the destination split up front. Consolidation across destinations is only available if we know the destinations before beads are allocated.

Where a custom bead is involved, the tech pack has to name it before a floor can be quoted at all.

How quickly is a minimum confirmed?

The minimum is confirmed inside the 48-hour quote window. Where a custom bead is involved, the die and dye-lot question takes longer to answer properly, and it is better answered slowly than guessed — a floor quoted before the bead is understood will move later, which is worse than waiting two days.

Sampling, which is quoted separately, is not subject to a minimum. A sample is one piece.

Retail packing is the third of those, since a presentation decision changes the carton count and therefore the freight cubing.

Which three costs does a minimum touch?

The minimum is a quantity, not a cost, but it interacts with three costs. Tooling, which is a one-time line. Testing, which is quoted per market and is cheaper per unit on a larger run because it can be spread across the units of the order. And freight, which rewards a full carton count.

A programme sitting just under a minimum often becomes viable not by raising the quantity but by changing which of those three it carries.

Three neighbouring answers move with this one. Cost levers explains which design change frees the most room. Sampling is where a substitution can still be tested, and lead times is what the resulting quantity has to be scheduled against. Underneath all three sits bead count, because a colour-count sheet for a fully covered strand and one for a scattered accent build commit very different amounts of material, and dyed-to-match colours bring their own lot sizes with them.

Why is a custom bead in small quantity hard?

Where a buyer needs a small quantity of a custom bead. That is the one combination the arithmetic resists, because tooling and dye lots are both indivisible. The usual resolutions are to substitute a library bead that reads the same at a distance, to accept the tooling as a separate paid item, or to delay the custom bead to a second season once the style has proven itself.

They also come unstuck when a minimum is agreed against a consolidated run and the consolidation then falls away. If one destination withdraws, say so before beads are allocated.

The construction itself is hand-strung on cord, so there is no machine setup to amortise and no tooling to spread unless a bead has to be moulded.

Why is a bead minimum not a machine setup?

In most home categories a minimum is a function of machine setup, so it is stable across a range: one setup, one number. In beadwork there is no machine setup to speak of, and the equivalent constraints sit in the bead itself — whether it exists, what batch its colour comes in, and whether a die has to be cut.

That is why we set minimums per design rather than across the range. It is also why the answer to "what is your MOQ" is a question back about the design, and why that question is not a sales tactic.

Extractable data

What moves a minimum, and in which direction

The real drivers behind a per-design minimum. Minimums are set per design and confirmed with your quote.
DriverWhat it isEffect on the minimum
Bead availabilityWhether every bead in the design is already in the working libraryA library bead keeps it low. A bead that has to be drawn or moulded raises it
Dye-lot sizeThe batch a colour is dyed or melted in, which cannot be split indefinitelyA custom colour carries a lot size, and the lot sets a floor
ToolingA die for a bead shape that does not exist yetRaises it, because the one-time cost has to be recovered against the run
Pattern complexityRule-strung, scattered, or mapped bead by beadChanges the labour per piece rather than the floor, but it changes the viable price at a given quantity
Colourway consolidationWhether colourways or destinations can be run togetherThe strongest lever downwards. Running two destinations as a single order changes the arithmetic
FormatFlat tabletop work against large-format hanging workDifferent formats carry different floors; they are quoted separately

Good to know

Questions buyers ask about Beadwork order minimums

What is confirmed per quote rather than published?

The minimum itself. We set minimums per design rather than across the range, because a plain-strand curtain and a fully patterned one use very different amounts of material and stringing time. Send the specification and the minimum comes back with the price.

What happens if the specification changes mid-run?

A change to the bead or the colour can change the minimum, because both touch dye lots and bead allocation. A change to size, packing or labelling usually does not. If a change arrives after beads have been allocated, the original minimum has already been committed to.

How long does this stage take?

The minimum is confirmed with the formal quote, which follows within 48 hours of a complete specification. It is not a separate process and should never be a separate conversation.

What do you need from us first?

Quantity per colourway rather than a total, and whether colourways and destinations may be consolidated. Those two answers change the arithmetic more than anything else you can tell us.

Is this quoted separately?

The minimum is part of the quote. Sampling is quoted separately from production, and a sample is not held to a minimum — a sample is one piece.

Does it differ for macramé?

Yes, and differently. Knotted work has no bead library or dye lot behind it, so availability and lot size matter less; cord colour and the frame become the constraining items instead. Knotted work also runs on the longer 60 to 90 day production window.

What can be compressed, and what cannot?

Consolidation compresses a minimum. Simplifying to library beads compresses it. What cannot be compressed is a dye lot: a colour melted or dyed to order comes in a batch size, and asking for a tenth of a batch does not make the batch smaller.