Reference
Minimums per design
Minimums are set per design, and what sets one: bead availability, dye lots, tooling, and whether colourways can be consolidated.
Read the guideOrdering · Cost
Pricing is set per design, because a cost per square foot is a meaningless number in a category priced by bead count. What exists is a hierarchy of levers, and a cost sheet shown before any sample is made.
Five levers move a bead price, in this order of effect: bead size and material first, then construction, then strand spacing, then the dowel and the packing, then height. Before any sample is made we show a rough cost sheet setting out where the cost sits and which lever moves it, so look can be traded against price early rather than after sampling.
Nobody can quote a beaded piece from its dimensions, and cost per square foot is not a real figure in this category. The cost is in the count.
A densely patterned 90 by 200 cm curtain can hold about 11,800 beads, each one placed by hand. A spaced panel at the same width and drop holds a fraction of that. Same square footage, materially different product. Any number expressed per square foot would be right for one of those two and badly wrong for the other.
What is publishable is the lever hierarchy, and the fact that we show a rough cost sheet before any sample is made, so you can trade look against price while changes are still free.
You send a brief with a cost target if you have one. We cost the design as briefed, then cost one or two variants that move the largest lever available — usually a smaller main bead, a de-densified field, or a repeating pattern in place of a graded one. The sheet shows where the cost sits across material, stringing, header and packing, and names the lever with the most room in it.
You pick a direction. We sample that direction once, rather than sampling the original and then negotiating. That ordering is the difference between one sampling cycle and three.
Bead count, and whether the pattern can be strung to a rule or has to be read from a map.
A rule-strung strand — so many of the base bead, an accent every so often — can be strung at pace. A mapped pattern, where the position of every accent is set by a drawing, is a slower product to make at the same bead count, because the person stringing it is reading a position rather than repeating a sequence. Scattered accents placed deliberately at random, never aligned in a row, sit between the two: random is a rule, but it is a rule that still has to be watched.
The target. The designs that reach a workable cost do so because a target existed early and the build was engineered towards it. One portal went through iteration after iteration, landing on two bead sizes in one strand to get there; another took real cost out by simplifying the assembly method without touching the look.
Supply the target, the product type and the size, and the first cost sheet will be close enough to argue with.
Lead times are unaffected by a cost iteration taken before sampling, and badly affected by one taken after approval.
The rough cost sheet follows a complete brief quickly; formal quotes are delivered within 48 hours of a complete specification. A cost iteration that changes bead or density is a new cost sheet, not a new sample, so it costs hours rather than weeks. Only a change that has to be seen physically pushes into the 16-to-20-day sampling window.
That is the whole argument for doing cost before sampling: iterations before the sample are cheap, and iterations after it are not.
No price appears on this property. Sampling is quoted separately from production. Market testing is quoted per market. Tooling for a custom bead is a one-time line. Freight depends on the Incoterm and on cube rather than weight, which for a bulky low-density load is a cost in its own right.
What is published is the production window: 40 to 60 days after sample approval for beaded décor.
Order minimums move with the same levers, which is why the two questions should be asked in one message.
Where a buyer's target was set against a different product. A valance priced like a printed pelmet, or a portal priced like a printed panel, cannot be reached by trimming — the labour content is in the beads and there is a floor under it.
Saying that early is more useful than six more cost sheets. What we can do instead is engineer the design, and we engineer it hard: bead size is the largest lever, then strand pitch, then drop length and format height, then bead material, then pattern complexity, then whether the build runs on library beads or needs a die cut — with carton cube deciding the freight. That is aggressive costing done on a drawing, where it is still free.
Labour is the majority of the cost on a patterned piece, and labour does not scale with volume the way machine time does. Doubling an order halves very little. What does move with volume is tooling recovery, carton efficiency and freight consolidation.
The second difference is that the cheapest change is usually invisible. De-densifying the infill of a motif, or putting a canvas or fabric ground behind a beaded area so fewer beads are needed to read the shape, takes real cost out without changing what the piece looks like from two metres away.
Cost engineering happens in design, not in production. The savings come from de-densifying bead fields, from substituting a repeating pattern for a gradient on a large wall piece, from reducing a piece's height, and from simplifying the assembly sequence. Every one of those is a decision made on a drawing before beads are strung.
Cost does not come out of a run after approval. Once a sample is sealed, the cost is the cost.
Panel headers and the stringing medium are the two components most often substituted quietly to hold a price.
The approved sample reference, so nobody re-engineers it quietly. The bead specification including the drill hole. The strand count. The pattern reference. The header and packing specification. And, where tooling was paid for, who owns the die and what happens to it if the programme stops.
That last clause is routinely left out and is worth more than most of the others.
Three reference sheets hold the numbers behind the levers. Bead count gives coverage per panel. Strand count and pitch gives density. Freight cubing gives the packing and shipping share. And the colour-count sheet is where a de-densified field or a repeating pattern is actually written down rather than described.
We send the rough cost sheet before sampling, the formal quote within 48 hours of a complete specification, and sample photographs for approval before the sample ships. You send the target, the colour references, the approval and the purchase order against the approved sample.
If a cost sheet ever arrives without naming which lever has room in it, ask for that line. It is the only part of the sheet that helps you.
Extractable data
| Lever | What it changes physically | How much room it gives |
|---|---|---|
| Bead size and material | Material volume per strand and the number of beads needed to fill a drop | The largest of the five. Changes the whole cost base |
| Construction | Whether a strand is fully covered, scattered with accents, or mapped bead by bead | Large. A mapped pattern is a different labour product from a rule-strung one |
| Strand count and spacing | Beads per panel, and the density the piece reads at | Moderate to large, and it is visible — the lever buyers feel most |
| Dowel, header and packing | The header component, inner packing and carton count | Moderate, and often the easiest to change late |
| Height | Drop length, so beads per strand | Real but the smallest of the five; a shorter piece is not proportionally cheaper |
Good to know
A cost target, if you have one, alongside the product type and size. With a target we can engineer a construction towards it; without one we quote the design as briefed and the conversation starts again. Saying the target out loud is not a weak position in this category — it is how the cost sheet gets useful.
The rough cost sheet is not charged. Sampling is quoted separately from production. Tooling, where a design needs a bead moulded to a die that does not exist, is identified as its own line rather than hidden in a unit price.
The hierarchy changes. For knotted work the largest lever is knot density and cord diameter rather than bead size, and the frame becomes a structural cost. Knotted work also runs on the 60 to 90 day window rather than 40 to 60, which affects the cost of money rather than the unit price.
Cost can be taken out by de-densifying a bead field, by repeating a pattern instead of grading it across the piece, by reducing height, and by simplifying assembly. What cannot be compressed is the hand-stringing rate on a mapped pattern: every bead in a mapped design is placed by a person reading a position.
The price, the minimum and the sampling charge. Minimums and pricing are set per design and confirmed with your quote, because a plain-strand panel and a fully patterned panel of the same dimensions are different commercial products.
Any change to bead, pattern or size resets the cost sheet, because all three change the bead count. Changes to the header or to packing can often be absorbed. A change after sample approval is a new approval, and the production window restarts from it.
Keep exploring
Reference
Minimums are set per design, and what sets one: bead availability, dye lots, tooling, and whether colourways can be consolidated.
Read the guideSpecification
How bead count is estimated from size, pitch and diameter — and why density matters more than dimensions.
Read the guidePillar
Brief, rough cost sheet, colour match, sample, production, packing — the six stages with the real published timings.
See the detailReference
16 to 20 days from an agreed brief, photographs approved before the sample ships, and why the sealed sample is the contract.
Compare the optionsReference
40 to 60 days after sample approval for beadwork, 60 to 90 for bohemian and macramé, with sampling in front of both.
Read the guide
Start a conversation
Send a reference, a colour chip or a sketch. Minimums are set per design and confirmed per quote; sampling is quoted separately and usually runs 16 to 20 days from an agreed brief.