Specification
The fixing
Plasterboard with and without a stud, timber, concrete and steel — and why the load has to be known first.
How it is madeSpecification · Fixing
A panel hung away from a wall has nothing to lean on. Every part of the load goes up into a ceiling that is usually full of something else.
A suspended bead panel has to land on structure, not on a ceiling lining. A joist, a soffit, a steel or a purpose-made pattress carries it; a plasterboard or tile ceiling does not. The drawing has to show the structure, the services around it, and the panel load, which comes from the weighed sample.
Where the load goes, and what else is already there. A wall-fixed panel leans on something solid behind it. A suspended one puts everything into the ceiling, which on most projects is the most contested plane in the building.

The second decision is restraint. A panel hung in free space swings, and whether that is charming or unacceptable is a decision to take before the panel is made.
| Item | What the drawing must state | Note |
|---|---|---|
| Structure at the fixing line | Joist, soffit, steel or slab | Shown on a reflected ceiling plan, not assumed |
| Suspended ceiling | Pattress or hanger back to the slab | The grid and the tile carry nothing |
| Panel load | Stated, from the weighed sample | Weighed at sampling, then the fixing is sized to it |
| Fixing centres | Spacing along the header | Longer headers need more than two points |
| Header type | Dowel, rail or track-compatible loops | Loops suit a track; a dowel suits brackets |
| Services coordination | Sprinklers, detectors, lighting, grilles, speakers | They share the ceiling plane with the fixing |
| Both-sides finish | Required where the panel is seen from both sides | A header designed against a wall will show its back |
| Hardware supply | By others | No tracks, rails or hangers are supplied with a panel |
The structure at the fixing line, the fixing centres, the panel load, the header type, and the services in the same plane. Shown on a reflected ceiling plan, because that is the drawing where the conflicts are visible.
A note that tracks, rails and hangers are by others belongs there too. No hardware is supplied with a panel.
Find the structure first. A joist, a soffit, a steel or the slab above a suspended ceiling. Then establish whether the ceiling is a lining or a structure: a plasterboard ceiling, a tile grid and a stretched fabric ceiling all carry nothing.
Then weigh the sample, select the fixing with margin, set the fixing centres along the header, and only then draw the header height, because the fixing position sets the drop.
The structure actually fixed to, the pattress or hanger detail, the fixing centres, and the panel weight as installed. All four, because a ceiling refurbishment will take the panel down and somebody will have to put it back.
Where a hanger runs back to a slab above a suspended ceiling, that detail is the most valuable thing in the handover file and the least likely to be recorded.
It changes the load by roughly a factor of two between glass and acrylic, which on a ceiling fixing is the difference between a straightforward detail and a structural one.
It also changes the swinging. A heavy glass panel has more inertia and moves less readily in moving air; a light acrylic, wood or bamboo panel moves constantly. In a void with a stack effect, a light panel will not be still.
Latitude on the fixing line, so the installer can land on structure. Joist positions do not follow drawn lines, and a fixing line specified to the millimetre will either miss structure or move.
The drop should be confirmed after the fixing is installed rather than before, since the fixing position determines where the header sits and therefore how long the strands need to be.
On a reflected ceiling plan, with the ceiling contractor and the services engineer in the same conversation. Sprinklers, smoke detectors, luminaires, air grilles and speakers all want the ceiling plane, and all of them have requirements the bead panel does not.
The bead panel is the easiest item in that list to move, which means it will be moved unless it is drawn early and the reason for its position is recorded.
The schedule carries structure, fixing type, fixing centres and load per location. The specification carries the header type, the both-sides finish requirement, the restraint position if there is one, and the note on hardware supply.
A suspended panel is almost always a one-off location, so most of the content ends up in the schedule rather than in the specification.
In suspended ceilings. A fixing into a tile grid holds briefly. A fixing into plasterboard above a doorway holds a light panel and not a heavy one. Both are discovered after installation.
The other recurring failure is a clash discovered on site: the panel line crosses a sprinkler head, and the panel moves by half a metre, which changes the geometry the design depended on.
A weighed panel, and the header viewed from behind. A header designed to sit against a wall is finished on one face and raw on the other, and a suspended panel shows both.
If the panel will swing, sample that too: hang a section at full drop in moving air and watch it.
Access decides everything. A panel suspended at four metres in a void needs a lift or a tower to clean, and that cost recurs for the life of the installation.
Where access is poor, the specification should favour materials that tolerate neglect — frosted and opaque beads over polished transparent glass — because the panel will be cleaned less often than the schedule claims.
A suspended panel is not restrained at the bottom and will move. A hanging strand panel cannot be specified to stay still in moving air, and a bottom restraint is available to develop rather than a standard option — so plan the position out of the draught instead.
Where stillness is required, that has to be raised as a development question rather than assumed. A bottom-fixed panel is a different product and nothing in our production record is one.
Good to know
The specifier, on a reflected ceiling plan, with the ceiling contractor and the services engineer. A bead panel fixing competes for the same plane as sprinklers, detectors, luminaires, grilles and speakers, and it is the item most easily moved — which is why it gets moved if it is not drawn early.
The structure the panel is actually fixed to, the pattress or hanger detail if one was installed, the fixing centres, and the panel weight as installed. A panel rehung after a ceiling refurbishment will need all four.
The structure at the fixing line on a reflected ceiling plan, the fixing centres, the panel load, the header type, and a note that tracks and hangers are by others. Plus the services in the same plane, which is the point of putting it on a reflected ceiling plan at all.
Enough latitude on the fixing line to land on structure, because joists are where they are. And the drop should be confirmed after the fixing is installed, since the fixing position determines the header height and therefore the drop.
A weighed panel, and the header detail viewed from the back. A header designed to sit against a wall looks unfinished from behind, and a suspended panel is seen from both sides by definition.
Access is the whole question. A panel suspended in a double-height void is cleaned from a lift or not at all, and that should be decided at specification stage rather than discovered by a facilities team with a ladder.
A suspended bead panel swings. It is not restrained at the bottom, so air movement, doors and passing people set it moving, and in a void with any stack effect it will move continuously. Where that is unacceptable the panel needs a bottom restraint, which changes the product.
Keep exploring
Specification
Plasterboard with and without a stud, timber, concrete and steel — and why the load has to be known first.
How it is madeSpecification
The dimensions, strand values, fixings and performance limits a drawing and schedule have to carry.
Compare the optionsSpecification
What hand-strung beadwork can hold on length, pitch, colour and count — and why a drawing has to say.
Specs and sizesSpecification
The colourway, one full strand, the header detail and the hem at full drop — the four things to see first.
Specs and sizesSpecification
A cleaning interval by setting, the method per material, who can reach the panel, and the spares held on site.
See the detail