Specification
What will hold the panel
What a beaded panel weighs by material and density, and which fixings suit light acrylic against heavy glass.
Open the reference
Guide · Install
Work out the load before choosing the fixing. Almost every failure in this subject is a fixing chosen for the look of the panel rather than its mass.
A steel wall plate, a wall plug, a fixing screw, a small group of deep lapis glass beads and a knotted length of stringing cord, laid out in a row.
Hang a heavy glass panel on a rod carried by brackets screwed into solid structure — a timber door lining, a joist, or masonry with the correct plug — with brackets rated above the panel's weight. Establish the weight before you choose: a glass panel of a given design is roughly twice the mass of the same panel in acrylic.
Two numbers and one unknown. The panel's weight, the fixing's rating, and what is actually behind the wall.
Get the first two and the job is arithmetic. The third is where almost every failure comes from, because a wall that looks like masonry is often plasterboard on dabs, and a fixing that would hold in one holds nothing in the other.
The panel's weight, which should come from the panel rather than from an estimate. A shipping weight off the carton is close enough; the dowel and packing are a small part of it.
Then a drill suited to the substrate, the correct anchors, a level, and brackets rated above the panel's weight with margin. And for a full-length panel, a second pair of hands: a 90 × 200 cm glass panel is awkward as well as heavy, and one person holding a dowel at its centre will bow it.
The panel's weight should come from the panel rather than from an estimate. A shipping weight off the carton is close enough; the dowel and packing are a small part of it.
Establish the substrate first, because fixing into plasterboard and fixing into masonry are different jobs. Tap, probe with a bradawl, or use a detector. On a doorway, the answer is usually a timber lining, which is the best fixing available in most houses.
Mark bracket positions, set in from each end by about a tenth of the panel's width. Two brackets for a 90 cm panel; three for 120 cm, because a long dowel will bow under glass before a bracket fails.
Drill, anchor, fit the brackets, level them against each other.
Fit the rod.
Never hang a glass panel from a fixing you have not tested by pulling down hard on the rod before the panel goes anywhere near it.
Then lift the panel by its dowel, two people, and seat it on the rod.
Settle it: run your hands down the panel in sections to free crossed strands, and leave it a day.
It is the only variable that really matters here. Glass is roughly 2.5 g/cm³ as a general material figure, acrylic about 1.2, most woods below 1. The same design, same strand count, same drop is therefore about twice the load in glass as in acrylic.
Within glass, bead size and density do the rest. A spaced 90 × 200 cm panel holds a bead count of about 3,100 on our 2027 design-render basis; a densely patterned one of the same size about 11,800. That is a near-fourfold difference in bead mass inside one set of dimensions, and it is exactly why "a 90 by 200 glass curtain" is not a weight.
In plasterboard. A plain plastic plug in plasterboard will hold a picture and will not hold a glass bead panel; it pulls through, taking a cone of board with it.
The second most common failure is an adhesive hook, used because the installer did not want to drill. Adhesive fails suddenly and completely, and under a glass panel the result is several thousand beads on a hard floor.
Third: one bracket too few. A dowel carrying glass over 120 cm with only two brackets will bow visibly within months, and a bowed dowel puts an uneven load on the end strands.
Lift it by the strands. Hang it from a tension rod. Hang it from picture hooks. Use a single central fixing. Leave the transit ties on while hanging.
And never hang a glass panel from a fixing you have not tested by pulling down hard on the rod before the panel goes anywhere near it.
An hour. Twenty minutes to establish the substrate and choose the anchor, twenty to fix and level the brackets, ten to hang, ten to settle and tidy.
If that sounds long for hanging a curtain, compare it with the alternative: a panel of about 11,800 glass beads on a tiled floor, which is a two-hour clear-up and a lost panel.
We size the header to the panel rather than using one dowel for everything.
The choice among the panel headers is a design decision: a round wooden dowel on most constructions, turned in our own Saharanpur wood factory, a rectangular beam profile where the span and the load call for it, and a stained wooden header rail where the header is part of the look. On a wide, heavy format the rail is the right component, because a round dowel is the thing most likely to bow.
The other manufacturing answer to weight is the bead itself. Glass strength is colour-dependent, and larger feature beads can go through annealing for strength: on one Venetian-glass portal we changed the furnace process, annealed the beads and revised the palette so incompatible colours were not clinking together in the hanging panel. A heavy panel is a panel whose beads move against each other under their own mass, and that is engineered at sampling rather than fixed on site.
Almost always, even after a fall. A glass panel that has come down usually loses a handful of beads and one or two strands, and the strands re-string in bead-map order from the spares.
What should be replaced is the fixing. On a contract installation we would rather re-string a strand on site and upgrade the bracket than supply a new panel onto the fixing that failed.
That a glass panel needs brackets into structure and is not a tension-rod product, and that the panel's weight is on the carton.
Then the handling instruction, which matters more on glass than on anything else: lift by the dowel, two people on a full-length panel, and remove transit ties only after it is hanging.
The spare beads. The original stopper bead from each strand. One spare bracket and its anchors, because matching a bracket in five years is harder than it sounds.
And the carton, if there is anywhere to put it. A glass panel that has to move house travels in its own packing with the strands kept in order, or it does not travel well at all.
The last thing worth keeping is the number. Write the panel's weight and the bracket rating on the back of the architrave in pencil, because in five years the person deciding whether that fixing is still adequate will not be the person who chose it.
Extractable data
| Substrate | Fixing | Suits | Notes |
|---|---|---|---|
| Timber door lining | Woodscrews into the lining, through brackets | Any glass panel | The best fixing available in most houses |
| Ceiling joist | Coach screw or heavy screw eye into the joist | A panel hung away from a wall | Find the joist; do not trust plasterboard |
| Masonry wall | Plug and screw, or a resin anchor | Any glass panel | Drill the correct hole size for the plug |
| Plasterboard on dabs or battens | Rated cavity anchor, or a batten spanning two studs | Only with a rated anchor | Adhesive hooks and plain plugs will pull out |
| A timber batten across the opening | Batten plugged to structure, panel hung from batten | Wide openings and shopfits | Spreads the load and allows repositioning |
| Number of brackets, 90 cm panel | Two | — | Set in about a tenth of the width from each end |
| Number of brackets, 120 cm panel | Three | — | A long dowel bows before a bracket fails |
| What not to use | Adhesive hooks, tension rods, picture hooks | — | All of them will release under a glass panel |
| Formats to plan for | 90 × 200 cm, 120 × 200 cm, 120 × 180 cm | — | Our door and panel formats |
Good to know
No, if the panel is lifted by its dowel. A heavy glass panel is the one most likely to suffer in handling, because its mass is enough to part a single strand if somebody takes the weight on it. Two people, one at each end of the dowel, is the correct way to lift a full-length glass panel.
This page exists because of glass. The same design in acrylic is roughly half the mass and can go on a tension rod; in glass it needs brackets into structure. If the brief is unresolved, ask for both weights at quote stage and choose the fixing from the heavier one.
Yes, and a shopfit is where it should be done properly: a timber batten plugged into structure across the opening, with the panel hung from the batten. That spreads the load, lets the panel be repositioned for each scheme, and avoids drilling the same wall repeatedly.
Re-string it on the floor before the panel goes up, in bead-map order, from the spares if they were specified when you ordered. Finish with a crimp or the original stopper bead. On a glass panel, a strand repaired at height is a strand that will be repaired again.
An hour, properly. Twenty minutes of that is establishing what is behind the wall, which is the part that cannot be rushed and the part most often skipped. A glass panel on a fixing chosen by guesswork is the single most common serious failure in this category.
The panel, entirely. The wall keeps the fixing holes, which on masonry means filling and touching in, and on plasterboard means a proper repair where a cavity anchor was used. If reversibility matters more than glass does, specify acrylic and use a tension rod.
Keep exploring
Specification
What a beaded panel weighs by material and density, and which fixings suit light acrylic against heavy glass.
Open the referenceSpecification
Plasterboard with and without a stud, timber, concrete and steel — and why the load has to be known first.
See the detailGuides
One guide per question that arrives often enough to be worth answering properly.
View the rangeGuide
Each no-drill method with the weight it holds, heaviest first, and the one material choice that makes all of them work.
Specs and sizesGuide
Sizing one for a reveal, what a friction fixing really carries, and the materials it does and does not suit.
See the detail
Start a conversation
Send a reference, a colour chip or a sketch. Minimums are set per design and confirmed per quote; sampling is quoted separately and usually runs 16 to 20 days from an agreed brief.