Specification
What will hold the panel
What a beaded panel weighs by material and density, and which fixings suit light acrylic against heavy glass.
Specs and sizesSpecification · Fixing
The substrate decides the fixing, not the panel. And the load has to be known before either conversation can happen.
The substrate decides the fixing. Plasterboard without a stud takes the least and needs a cavity fixing or a spreader; timber, concrete and steel take progressively more. None of it can be selected until the panel load is known, and no panel weight is published, so the load comes from weighing the approved sample.
How the load gets into the building. The panel is fixed and finished; everything on this page is about the last two hundred millimetres between the header and the structure.

And the decision cannot be made at all until the load is known. That is the sequence problem this page exists to fix.
| Substrate | What the drawing must state | Note |
|---|---|---|
| Plasterboard, no stud | Cavity fixing type, or a timber spreader behind the board | The weakest case; the board is not the structure |
| Plasterboard on a stud | Stud position, and that the fixing lands in it | Stud positions rarely coincide with a drawn header line |
| Timber frame or lining | Fixing type and penetration depth | The easiest case and the most common in retail fit-out |
| Concrete or masonry | Anchor type and hole depth | Strong; drilling coordination and dust control matter |
| Steel | Fixing method and whether drilling is permitted | Often prohibited on structure; check before drawing |
| Existing door frame | Fixing into the frame or into the reveal | Suits tension rods and cup hooks on light panels |
| Panel load | Stated, from the weighed sample | Weighed at sampling; the fixing is sized to it |
| Fixings supplied | By others | No rods, brackets, hooks or tracks are supplied with a panel |
The substrate at the header line, the fixing type and spacing, the panel load, and a note that fixings are by others.
The load is the one that is missing from most drawings, because no panel weight is published and nobody has weighed the sample. It is a five-minute task that unblocks the whole fixing conversation.
Agree the header line with the contractor. Confirm what is actually behind the board at that line, by opening up or by scanning rather than by assuming. Weigh the approved sample. Then select a fixing with margin over the weighed load.
If the substrate at the agreed line turns out to be plasterboard with no stud, the options are a cavity fixing sized for the load, a timber spreader behind the board, or moving the header line to find structure. All three are cheaper to decide in design than on site.
That the fixing families sort by panel weight. A tension rod inside a door frame, with no drilling at all, suits light acrylic, bamboo and wood panels and is the usual answer in rented spaces. Cup hooks or screw hooks are simple and strong and hold a dowel or its loops. A rod and brackets is the default for heavier glass panels and wide openings. Ceiling hooks or a track are for panels hung away from a wall, fixed into a joist.
Those are four families, not four ratings. The panel is weighed on the approved sample, and the fixing is then selected and checked against that weight by the project.
The substrate as found, the fixing type and size used, the fixing positions, and the panel weight as installed. A replacement in five years gets hung on the same fixings by somebody who was not there.
If a spreader plate or a timber pattress was installed behind the board, that is the single most valuable line in the whole handover pack.
It roughly doubles or halves the load. Glass runs around 2.5 grams per cubic centimetre against acrylic at about 1.2 and most woods below 1, so the same panel in glass is a materially different fixing problem from the same panel in acrylic.
The header adds to it. A timber dowel or a stained rail is itself a load, carried by the same fixing, and a heavier panel usually gets a more substantial header, so the two increase together.
On fixing position, enough latitude to find structure. A header line drawn to the millimetre is unhelpful when the studs are at 400 or 600 centres and none of them is at the drawn line.
On load, none. A fixing is chosen with margin over the load, not matched to it, and the margin is the installer's judgement rather than a number from us.
By making the substrate a design question rather than a site discovery. The useful request is for the contractor to confirm what is behind the board at the header line before the drawing is issued for construction.
On a refurbishment that often means opening up. It is a small cost against a re-issued drawing and a panel that has to be rehung.
The schedule carries the substrate and fixing per opening, because they vary. The specification carries the fixing families, the load statement, the substitution control and the note that fixings are by others.
Substrate belongs in the schedule precisely because it is the thing that differs between two openings that otherwise take identical panels.
Plasterboard, every time. The header line lands between studs, the installer uses a plasterboard plug because that is what is in the van, and the panel is held by a 12 mm sheet of gypsum.
Light acrylic panels survive that. Glass panels at full drop do not, and the failure is sudden rather than gradual.
A weighed panel. It is the sample nobody takes, because the approval sample is reviewed for colour, construction and hem and then packed away without going on a scale.
Weighing it costs nothing and turns this entire page from guidance into arithmetic.
A panel that will be taken down for cleaning needs a fixing that can be released and re-engaged repeatedly. Cup hooks and a dowel do that well; a permanently fixed rail does not.
That is worth deciding at specification stage on anything in a commercial setting with a real cleaning schedule, because the alternative is a panel cleaned in place badly or not at all.
Good to know
We do not rate fixings and we do not publish a panel weight, so the limit is that fixing selection sits with the installer against a load that has to be measured. What we can say is which fixing families suit which panel weights, and that is guidance rather than a rating.
The specifier, with the contractor, before the header line is fixed. The sequence that works is: agree the header line, confirm the substrate at that line, weigh the sample, then select the fixing. Reversing any two of those steps produces a re-issued drawing.
The substrate as found, the fixing type and size actually used, its position, and the panel weight as installed. A replacement panel in five years will be hung on the same fixings, and whoever does it needs to know what is behind the board.
The substrate at the header line, the fixing type and spacing, the panel load, and a note that fixings are by others. Without the load the fixing cannot be checked by anyone, and a fixing nobody has checked is the commonest cause of a panel coming down.
On fixing position, enough to find a stud: a drawn header line to the millimetre is unhelpful if the studs are where they are. On load, no tolerance — a fixing is selected with margin over the load rather than matched to it.
A weighed panel. That is the sample this page actually needs, and it is the one most often skipped because the sample is approved for appearance and then not put on a scale.
Keep exploring
Specification
What a beaded panel weighs by material and density, and which fixings suit light acrylic against heavy glass.
Specs and sizesSpecification
The dimensions, strand values, fixings and performance limits a drawing and schedule have to carry.
Read moreSpecification
Tracks, joists, suspended rails and the services coordination a drawing has to show.
Compare the optionsSpecification
How pitch, diameter and opacity combine into a sightline — and the distance at which concealment stops working.
View the rangeSpecification
How transmission, refraction and cast bead-shadows behave through the day — and where glare control fails.
View the range
Start a conversation
Send a reference, a colour chip or a sketch. Minimums are set per design and confirmed per quote; sampling is quoted separately and usually runs 16 to 20 days from an agreed brief.