Specification · Fixing

Fixing into substrates

The substrate decides the fixing, not the panel. And the load has to be known before either conversation can happen.

The short answer

The substrate decides the fixing. Plasterboard without a stud takes the least and needs a cavity fixing or a spreader; timber, concrete and steel take progressively more. None of it can be selected until the panel load is known, and no panel weight is published, so the load comes from weighing the approved sample.

Key takeaways

  • Know the load first. Everything on this page is unanswerable without it.
  • No panel weight is published, so the load comes from the weighed approved sample.
  • Plasterboard alone is the weak case: find the stud, or use a spreader plate.
  • No fixings, rods, brackets or tracks are supplied with a panel, and none is load-rated by us.
  • Tension rods suit light acrylic, wood and bamboo panels. A glass panel at full drop wants brackets.

How does the load get into the building?

How the load gets into the building. The panel is fixed and finished; everything on this page is about the last two hundred millimetres between the header and the structure.

The top of eight bead strands knotted over a turned wooden dowel, the first bead on each strand sitting tight against the knot.

And the decision cannot be made at all until the load is known. That is the sequence problem this page exists to fix.

Which substrate and fixing figures must be drawn?

Guidance from our own installation advice. The panel is weighed on the approved sample, so the installer can size the fixing against a real load; the fixing itself is rated by its own manufacturer.
SubstrateWhat the drawing must stateNote
Plasterboard, no studCavity fixing type, or a timber spreader behind the boardThe weakest case; the board is not the structure
Plasterboard on a studStud position, and that the fixing lands in itStud positions rarely coincide with a drawn header line
Timber frame or liningFixing type and penetration depthThe easiest case and the most common in retail fit-out
Concrete or masonryAnchor type and hole depthStrong; drilling coordination and dust control matter
SteelFixing method and whether drilling is permittedOften prohibited on structure; check before drawing
Existing door frameFixing into the frame or into the revealSuits tension rods and cup hooks on light panels
Panel loadStated, from the weighed sampleWeighed at sampling; the fixing is sized to it
Fixings suppliedBy othersNo rods, brackets, hooks or tracks are supplied with a panel

The substrate at the header line, the fixing type and spacing, the panel load, and a note that fixings are by others.

The load is the one that is missing from most drawings, because no panel weight is published and nobody has weighed the sample. It is a five-minute task that unblocks the whole fixing conversation.

How do you confirm what is behind the board?

Agree the header line with the contractor. Confirm what is actually behind the board at that line, by opening up or by scanning rather than by assuming. Weigh the approved sample. Then select a fixing with margin over the weighed load.

If the substrate at the agreed line turns out to be plasterboard with no stud, the options are a cavity fixing sized for the load, a timber spreader behind the board, or moving the header line to find structure. All three are cheaper to decide in design than on site.

How do fixing families sort by weight?

That the fixing families sort by panel weight. A tension rod inside a door frame, with no drilling at all, suits light acrylic, bamboo and wood panels and is the usual answer in rented spaces. Cup hooks or screw hooks are simple and strong and hold a dowel or its loops. A rod and brackets is the default for heavier glass panels and wide openings. Ceiling hooks or a track are for panels hung away from a wall, fixed into a joist.

Those are four families, not four ratings. The panel is weighed on the approved sample, and the fixing is then selected and checked against that weight by the project.

Which fixing details are recorded as found?

The substrate as found, the fixing type and size used, the fixing positions, and the panel weight as installed. A replacement in five years gets hung on the same fixings by somebody who was not there.

If a spreader plate or a timber pattress was installed behind the board, that is the single most valuable line in the whole handover pack.

Does material double or halve the load?

It roughly doubles or halves the load. Glass runs around 2.5 grams per cubic centimetre against acrylic at about 1.2 and most woods below 1, so the same panel in glass is a materially different fixing problem from the same panel in acrylic.

The header adds to it. A timber dowel or a stained rail is itself a load, carried by the same fixing, and a heavier panel usually gets a more substantial header, so the two increase together.

How much latitude does a header line need?

On fixing position, enough latitude to find structure. A header line drawn to the millimetre is unhelpful when the studs are at 400 or 600 centres and none of them is at the drawn line.

On load, none. A fixing is chosen with margin over the load, not matched to it, and the margin is the installer's judgement rather than a number from us.

How do you make the substrate a design question?

By making the substrate a design question rather than a site discovery. The useful request is for the contractor to confirm what is behind the board at the header line before the drawing is issued for construction.

On a refurbishment that often means opening up. It is a small cost against a re-issued drawing and a panel that has to be rehung.

Which fixing data varies per opening?

The schedule carries the substrate and fixing per opening, because they vary. The specification carries the fixing families, the load statement, the substitution control and the note that fixings are by others.

Substrate belongs in the schedule precisely because it is the thing that differs between two openings that otherwise take identical panels.

Why does plasterboard fail every time?

Plasterboard, every time. The header line lands between studs, the installer uses a plasterboard plug because that is what is in the van, and the panel is held by a 12 mm sheet of gypsum.

Light acrylic panels survive that. Glass panels at full drop do not, and the failure is sudden rather than gradual.

Why is a weighed panel the missing sample?

A weighed panel. It is the sample nobody takes, because the approval sample is reviewed for colour, construction and hem and then packed away without going on a scale.

Weighing it costs nothing and turns this entire page from guidance into arithmetic.

Does a panel need a releasable fixing?

A panel that will be taken down for cleaning needs a fixing that can be released and re-engaged repeatedly. Cup hooks and a dowel do that well; a permanently fixed rail does not.

That is worth deciding at specification stage on anything in a commercial setting with a real cleaning schedule, because the alternative is a panel cleaned in place badly or not at all.

Good to know

Questions buyers ask about Fixing beadwork into substrates

What is the performance limit here?

We do not rate fixings and we do not publish a panel weight, so the limit is that fixing selection sits with the installer against a load that has to be measured. What we can say is which fixing families suit which panel weights, and that is guidance rather than a rating.

Who coordinates the fixing?

The specifier, with the contractor, before the header line is fixed. The sequence that works is: agree the header line, confirm the substrate at that line, weigh the sample, then select the fixing. Reversing any two of those steps produces a re-issued drawing.

What does the as-built pack need?

The substrate as found, the fixing type and size actually used, its position, and the panel weight as installed. A replacement panel in five years will be hung on the same fixings, and whoever does it needs to know what is behind the board.

What has to appear on the drawing?

The substrate at the header line, the fixing type and spacing, the panel load, and a note that fixings are by others. Without the load the fixing cannot be checked by anyone, and a fixing nobody has checked is the commonest cause of a panel coming down.

What tolerance should be allowed?

On fixing position, enough to find a stud: a drawn header line to the millimetre is unhelpful if the studs are where they are. On load, no tolerance — a fixing is selected with margin over the load rather than matched to it.

What should be sampled before approval?

A weighed panel. That is the sample this page actually needs, and it is the one most often skipped because the sample is approved for appearance and then not put on a scale.

Keep exploring

Related pages

Specification

Specifying beadwork

The dimensions, strand values, fixings and performance limits a drawing and schedule have to carry.

Read more

Specification

Glare control

How transmission, refraction and cast bead-shadows behave through the day — and where glare control fails.

View the range

Start a conversation

Bring us a bead you cannot find

Send a reference, a colour chip or a sketch. Minimums are set per design and confirmed per quote; sampling is quoted separately and usually runs 16 to 20 days from an agreed brief.