Guide
How to clean beaded curtains without damaging the cord
Dry dusting first, spot cleaning the beads, keeping the cord dry, what never to use, and how to handle a broken strand.
Specs and sizesSpecification · Maintenance
Written for the facilities team who will inherit it, not for the designer who specified it. Access decides more of this than material does.
A maintenance schedule for beadwork needs four things: a cleaning interval set by the setting rather than by the material, the method appropriate to each bead material, a statement of who can physically reach the panel, and the spares held on site. The method varies by material and the interval does not.
Whether the panel they are specifying can realistically be looked after in the building it is going into. That is a material and density decision as much as a schedule one, and it is made at specification stage rather than at handover.

The schedule itself is the easy part. The part is matching it to the access the building actually has.
| Material | Method | Avoid |
|---|---|---|
| Acrylic | Dust, or wash strands in lukewarm water with mild soap and dry hanging | Solvents and very hot water |
| Glass | Dust, or wipe with a damp cloth | Knocking beads together hard; glass chips |
| Wood | Dust or wipe with a dry cloth | Soaking, and constant steam |
| Bamboo | As wood: keep dry | Rain, persistent damp and outdoor positions |
| Faux capiz discs | Wipe with a soft damp cloth and dry | Abrasive cleaners, which dull the surface |
| Ceramic and metal beads | Dust or wipe | Abrasives on a plated finish |
| Timber header | Keep dry at all times | Washing the header with the strands |
| Cord | Keep dry; dry fully hanging if wetted | Leaving cotton cord damp, which shortens its life |
The access method and whether the panel is designed to be taken down. Both of those are drawing content because both affect the fixing.
The schedule itself belongs in the operation and maintenance manual, with the care card by material and the spares inventory beside it.
Set the interval from the setting. A panel at a kitchen or terrace doorway needs attention far more often than one in a hotel corridor, and one in a restaurant needs it more often than one in a bedroom. Nothing about the bead material changes the interval; the environment sets it.
Then set the method from the material, from the table above. Then check the access: can housekeeping reach it, or does it need a tower? Then decide whether the panel comes down, which feeds back into the fixing.
A spare strand reserved specifically for cleaning trials. Every proprietary product a facilities team wants to use should be tried on it before it touches the panel.
That strand belongs in the spares package by design, not as a leftover, and the maintenance schedule should name it.
It should change the specification, which is the whole argument of this page. Transparent polished glass at a tight pitch in a high, inaccessible position is the hardest combination in the category to maintain, and it is also the most commonly specified because it looks best in a render.
A frosted or opaque bead at a looser pitch in the same position will look better after two years, because it does not depend on being clean to do what it does.
None of the cleaning guidance is tested procedure. It is general advice derived from how the materials behave, and no cleaning agent, dressing or anti-static product has been tested against our bead materials, finishes or cords.
Cleaning interval, service life and any warranty position are set against a specific installation rather than read off a page, so a facilities team should agree all three at handover.
That the method genuinely differs by material, and that the header is the part people get wrong. Acrylic strands can be washed in lukewarm water with mild soap and dried hanging; glass, wood, bamboo and faux capiz are wiped or dusted.
In every case the wooden header stays dry. Washing the header with the strands is the single most damaging thing a well-intentioned cleaner can do to a bead panel, and it is also the most intuitive.
Five things: the care card by material, the cleaning interval, the access method, the spares inventory and the colour-count sheet.
The sheet is the one that looks out of place in a maintenance pack and is the most important. Without it, a damaged strand cannot be replaced to the right length or the right sequence, and the panel becomes a replace-whole item rather than a repairable one.
It changes the method entirely and the tolerance for neglect. Acrylic is the most forgiving: it does not shatter, it washes, and it is indifferent to damp. Glass is the most rewarding and the least forgiving, because dust takes away the refraction that justified it.
Wood and bamboo have a different vulnerability again: they are the materials that mark in damp and should not be in a steamy or external position whatever the cleaning schedule says.
Allow for the schedule being met less often than written. A panel at high level with no permanent access gets cleaned when a tower happens to be on site, which may be annually rather than quarterly.
Specifying the material for the real interval rather than the written one is the useful discipline, and it usually means choosing a bead that does not depend on being spotless.
Through the fixing and through access provision. If the schedule assumes the panel comes down, the fixing has to release and re-engage repeatedly, which rules out a permanently fixed rail.
If the schedule assumes cleaning in place at height, the building has to provide a way of reaching it, and that is a facilities provision rather than a finishes one.
The maintenance schedule — intervals, methods, access — goes in the operation and maintenance manual. The specification carries the care card, the spares requirement and the take-down requirement, because all three have to be bought.
Spares in particular have to be ordered with the panels, in the same production run and the same dye lot. A spares line added after handover is a second production cycle in a different lot.
Good to know
None of this is tested procedure. It is general guidance from material behaviour, and no cleaning agent has been tested against our bead materials, finishes or cords. A facilities team using a proprietary product should trial it on a spare strand before using it on a panel.
The fixing decides whether the panel can be taken down to clean. Cup hooks and a dowel release easily; a permanently fixed rail does not. If the schedule assumes the panel comes down, the fixing has to allow it, and that is a specification decision rather than a maintenance one.
The care card by material, the cleaning interval, the access method, the spares inventory and the colour-count sheet. Those five make a panel maintainable; without the last one a damaged strand cannot be replaced to the right length.
The access method, and whether the panel is designed to be taken down. Both affect the fixing, which is drawing content. The schedule itself belongs in the operation and maintenance manual rather than on a drawing.
Allow for the schedule being met less often than it says. A panel at high level with no permanent access will be cleaned when a tower is on site for something else, so the material specification should assume a longer real interval than the written one.
A spare strand, kept specifically for cleaning trials. Every proprietary product a facilities team wants to use should be tested on it first, and that strand should be part of the spares package rather than an afterthought.
It should change the material and the density at specification stage. Transparent polished glass at a tight pitch in a high, inaccessible position is the hardest combination to maintain, and a frosted or opaque bead at a looser pitch in the same position will look better for longer.
Keep exploring
Guide
Dry dusting first, spot cleaning the beads, keeping the cord dry, what never to use, and how to handle a broken strand.
Specs and sizesSpecification
Spare beads by colour, pre-made replacement strands, the cord spec, and who re-strings a strand on site.
Read the guideSpecification
The dimensions, strand values, fixings and performance limits a drawing and schedule have to carry.
Read the guideSpecification
Why the opening is the budget unit, which five levers move the figure, and how to trade look against price early.
Specs and sizesSpecification
Width at three heights, the drop against the floor gap, and the header depth — the measurements a quote needs.
How it is made
Start a conversation
Send a reference, a colour chip or a sketch. Minimums are set per design and confirmed per quote; sampling is quoted separately and usually runs 16 to 20 days from an agreed brief.