Specification · Specification

Measuring an opening

Three measurements and one decision. The decision is the floor gap, and it is the one most briefs leave to the factory.

The short answer

Measure the opening width at three heights, the height from the intended header position to the floor, and the depth of the reveal. Then decide the floor gap, because the finished drop is the height less the header depth less that gap. Those four values are what a beadwork quote needs before anything else.

Key takeaways

  • Width at three heights, because openings are not square and the narrowest one governs.
  • The floor gap is a decision, not a remainder. State it.
  • Finished drop = header-to-floor height, less header depth, less floor gap.
  • North American interior doors run 28 to 36 in; 90 cm covers most, 120 cm covers the rest.
  • Say whether the panel hangs inside the reveal or over the face of the opening.

Where does the panel start and stop?

Where the panel starts and where it stops. The opening gives you the envelope; the specifier decides the header position within it and the floor gap below it, and the drop is what is left.

Bead strands cut to stepped lengths so an arched opening is cut out of the middle of the panel, the ground showing through the arch.

The second decision, often unstated, is whether the panel hangs inside the reveal or over the face of the opening. Those produce different widths and different fixings from the same opening.

Which measurements belong on the drawing?

Units for each measured value, and who holds the tolerance. Tolerances are agreed per specification against the sealed sample.
ValueUnitRealistic tolerance
Opening width, at three heightsmmTake the narrowest; an existing opening is rarely square
Header position to floormmMeasure to the finished floor, not to a screed
Reveal depthmmIt decides inside or face mounting
Floor gapmm, statedA decision, not a remainder; no house value is published
Header depthmmPer header type; a rod pocket takes more drop than a dowel
Finished panel widthmmAgreed across the header; state it, do not assume it
Finished dropmmTo a stated tolerance; shaped hems need the tightest
Mounting positionInside reveal or over the faceExact — it is a choice, not a dimension

Opening width measured at three heights with the positions marked. The height from the intended header position to the finished floor. The reveal depth. The floor gap, stated as a number rather than implied. And the mounting position in words.

Finished panel width and drop should then be dimensioned separately on the same drawing, so that nobody downstream has to do the subtraction and get it wrong.

How do you measure width and drop?

  1. Measure the width at three heights

    Measure the width at top, middle and bottom of the opening and take the narrowest.

  2. Measure from the header position to the finished floor

    Measure from where the header will sit to the finished floor.

  3. Measure the reveal

    Measure the reveal.

  4. Decide inside or face mounting

    Decide inside or face mounting, because that changes the width you are working to.

  5. Choose the floor gap and state it as a number

    Then choose the floor gap — enough that the strands hang free and the hem does not drag, stated as a number on the drawing rather than left to the installer.

  6. Subtract the header depth and the gap

    Subtract the header depth and the gap from the height. What remains is the finished drop.

Which per-opening data goes in the schedule?

The schedule carries the per-opening data: location reference, opening dimensions as found, mounting position, finished panel size, colourway and quantity. One line per opening.

The specification carries everything common to all of them: the construction, the bead and colour references, the header type, the tolerance and the inspection requirement. Repeating the construction on every schedule line is how two openings end up with different specifications by accident.

Why measure after the floor finish?

Openings measured before the floor finish went in. A tile build-up eats the planned floor gap, and on a long panel that is immediately visible.

The second failure is a header position that nothing can be fixed at. The measurement gets taken from a convenient line rather than from a structural one, and the fixing has to move, which moves the drop.

Why hang a full-drop strand first?

A full-drop strand, hung. It is the only way to find out whether the calculated drop gives the intended floor gap after the beads have settled under their own weight, which they do.

A photograph of a flat strand will not show it. The settling is small and it is of the same order as the floor gap people argue about.

What happens to a hem on the floor?

A hem on the floor is dragged. The end beads wear, the cord abrades at the last bead, and dust collects where it is hardest to brush out. A hem clear of the floor swings freely, cleans easily and lasts longer.

That makes the floor gap a maintenance decision as much as an aesthetic one, and it is worth stating on the schedule rather than leaving to the installer's eye.

Can a panel follow an out-of-square opening?

A hand-strung panel hangs plumb from its header. It cannot follow an out-of-square opening, and no amount of strand-length adjustment makes it look as though it does, because the strands are vertical and the eye reads them against the frame.

Where an opening is visibly out of square, the panel is specified square and the discrepancy is shown on the drawing so that the installer and the client both see it in advance.

What is the standard door panel size?

That the standard door panel is about 90 by 200 cm, roughly 35 by 79 inches, hung from a wooden dowel or rod, and that thirty hand-strung strands on a single dowel is the common build.

North American interior doors commonly run 28 to 36 inches wide. A 90 cm panel covers most of that range; a 36 inch door and anything wider takes the 120 cm panel. That single conversion resolves a large share of incoming width questions.

Which dimensions are recorded as found?

The dimensions as found rather than as drawn, the mounting position actually used, and the finished panel dimensions supplied. A replacement ordered in five years will be ordered against the as-built figures.

An opening drawn at 900 mm and built at 892 should be recorded at 892, with the panel width that was actually made against it.

How much does the drop move while settling?

It changes how much the panel settles and therefore how much the drop moves between the drawing and the hung piece. A heavy glass panel settles fast and sits where it will sit within minutes. A light acrylic, wood or bamboo panel moves more and takes longer to settle, and may need a deliberately heavier end bead before the drop reads consistently.

That is why the floor gap should be confirmed on a hung strand in the bead material actually specified, not on a sample in whatever was to hand.

Which dimensions carry an agreed tolerance?

Whatever has been agreed, on finished width across the header and on the drop. No tolerance allowance is published for beadwork, so the drawing has to carry one rather than refer to a standard. Where the hem is shaped, hold the longest and shortest drops tightest, because the eye reads those two as the drawn edge.

An opening measured on site carries its own tolerance, which should be absorbed by the panel being specified to the narrowest measured width rather than to the average.

When is the header position resolved?

By resolving the header position and the fixing at the same time. The measurement establishes where the header sits; what the header is fixed into decides whether it can sit there.

On a project the useful sequence is to agree the header line with the contractor, confirm the substrate at that line, then measure the drop from the agreed line. Measuring first and asking about the substrate later is how the drop gets re-issued.

Good to know

Questions buyers ask about Measuring an opening for beadwork

What does the as-built pack need?

The measurements as found, not as drawn, and the mounting position actually used. A panel replaced in five years will be ordered from the as-built dimensions, and an opening that was 892 mm rather than the drawn 900 should be recorded as 892.

What has to appear on the drawing?

Opening width and height with the measuring positions marked, the header position, the reveal depth, the floor gap, and whether the panel sits inside the reveal or over the face. Finished panel dimensions follow from those and should be dimensioned separately so nobody has to subtract.

What tolerance should be allowed?

Whatever has been agreed and written down. Gemixx publishes no tolerance allowance for beadwork, so the figure comes out of the specification rather than off a page: state one on finished width across the header and one on the drop, with the shaped-hem drops held tightest. On the opening itself, allow for the fact that it is rarely square and measure it at three heights.

What should be sampled before approval?

Not the measurement. What is worth sampling is a full-drop strand, because that is what reveals whether the drop you calculated produces the floor gap you wanted once the beads have settled under their own weight.

How does maintenance change the choice?

A hem that touches the floor is dragged across it every time the panel is used, which wears the end beads and collects dust at the point hardest to clean. A deliberate floor gap is as much a maintenance decision as an aesthetic one.

What is the performance limit here?

Measurement cannot absorb an out-of-square opening. A hand-strung panel hangs plumb from its header; if the opening leans, the panel will not follow it. Where an opening is visibly out of square, the panel is specified square and the difference is shown on the drawing.

Who coordinates the fixing?

The specifier, with the contractor. The measurement establishes where the header sits, and the header position determines what it is being fixed into. Those two have to be resolved together or the drop is measured from a position nothing can be fixed at.

Keep exploring

Related pages

Start a conversation

Bring us a bead you cannot find

Send a reference, a colour chip or a sketch. Minimums are set per design and confirmed per quote; sampling is quoted separately and usually runs 16 to 20 days from an agreed brief.