Specification · Programme

Programme and lead-time planning

Beadwork installs in an afternoon and takes months to arrive. The float belongs before production, not after delivery.

The short answer

The published durations are: a quote within 48 hours of receiving specifications, sampling usually 16 to 20 days from an agreed brief with photos approved before the sample ships, and production for beaded décor 40 to 60 days after sample approval. Freight and the approval loops sit on top of those.

Key takeaways

  • Quote within 48 hours of receiving specifications; enquiries answered within one business day.
  • Sampling usually 16 to 20 days from an agreed brief, with photo approval before the sample ships.
  • Production for beaded décor runs 40 to 60 days after sample approval. Bohemian and macramé run 60 to 90.
  • Sampling is quoted separately and is not part of the production lead time.
  • The float belongs before production starts. Nothing downstream can be compressed.

Where should the float sit in the programme?

Where to put the float, and how many sample rounds the programme can afford. Those are the only two levers, because the production duration is published and fixed and installation takes an afternoon.

A bead map worked out in beads themselves: one bead to a grid position, the flat geometric repeat that a beadworker follows strand by strand.

A bead package is unusual in that almost all of its time is spent before anything arrives on site, and all of the compressible time is in the decision-making rather than in the making.

Does programme belong on the drawing at all?

All durations are published figures from our own commercial terms. Freight, client approval loops and testing are project variables, quoted per project.
StagePublished durationNote
Enquiry responseWithin 24 hoursReplies within one business day
Formal quoteWithin 48 hours of receiving specificationsPresupposes a specification exists
Discovery callScheduled first on complex or multi-SKU projectsAdds to the front of the programme
SamplingUsually 16 to 20 days from an agreed briefQuoted separately from production
Sample photo approvalBefore the sample shipsA client-side duration, not ours
Sample transitQuoted per routeDepends on destination and service
Sample approvalClient-sideProduction does not start until it is given
Production, beaded décor40 to 60 days after sample approvalThe figure to plan against
Production, bohemian and macramé60 to 90 days after sample approvalA different category with a different duration
Testing, where requiredQuoted per projectArranged against the specified build
Freight and customsQuoted per routeLanded duty paid quoting is available
InstallationOne short visitNothing to compress

None, because programme belongs in the programme. The relevant drawing content is anything that could trigger a re-sample, which means every tolerance, colour reference and hem profile should be resolved on the drawing before sampling starts.

A re-sample is 16 to 20 days plus transit plus another approval cycle, and it is the largest single programme risk on a bead package.

How do you work back from the installation date?

Work backwards from the installation date. Installation is one visit, late in the fit-out, after lighting commissioning. Before it, freight and customs. Before that, 40 to 60 days of production for beaded décor, starting at sample approval.

Before that, the client-side approval, the sample transit, and 16 to 20 days of sampling from an agreed brief. And before that, the brief itself, the quote — issued within 48 hours of receiving specifications — and whatever discovery the project needs.

Which real dates should be recorded?

The real dates: brief agreed, sample approved, production completed, shipped, installed. On a phased project the second phase is planned from those rather than from published figures, and the difference between the two is usually where the first phase lost time.

Does the category matter more than the material?

Less than the category does. Beaded décor runs 40 to 60 days after sample approval. Bohemian and macramé work runs 60 to 90, which is a materially different programme for a visually adjacent product.

Within beaded décor, a design needing a custom moulded bead carries die work ahead of production, and a design needing a test carries the laboratory turnaround. Neither of those durations is published, and both should be asked for against the specific build rather than estimated.

Where should float sit, before or after production?

Float before production, not after delivery. The approval loops are where time can be recovered and they are also where it is usually lost, because a sample arrives, sits on a desk, and is approved three weeks later.

Naming an approval duration in the programme — and assigning it to a person — recovers more time than anything on the manufacturing side.

Why is the fixing detail on the critical path?

Through the fixing detail, which is earlier on the critical path than it looks. The header fixing has to be installed and load-tested before the panel arrives, so the fixing detail has to be issued well before shipment.

The second item is the lighting programme, because colour approval should follow lamp selection. On a tight job that creates a genuine conflict, and the resolution is to approve colour under a named reference light source and record the approval as conditional.

What would cause a re-sample later?

The programme carries durations. The specification carries anything that would cause a re-sample. The schedule carries quantities by colourway and destination, because those are what the production run is planned against.

Quantity by colourway matters to the programme as well as to the cost: a run split across several colourways is a different production plan from the same quantity in one.

Why does beadwork arrive late?

By arriving late, almost always for the same reason: a specification that was not complete enough to quote from, so the quote waited, so the sample waited, so production started six weeks after everyone assumed it had.

The remedy is at the front. A complete ten-field specification can be quoted within 48 hours; an incomplete one generates a round of questions first.

Why sample everything in one round?

Everything at once. The colourway, a full strand at full drop, the header detail and the hem. A sample round costs 16 to 20 days plus transit, so it should be asked to answer every open question rather than the most obvious one.

Do spares belong in the order or programme?

It adds an item to the order rather than to the programme. Spares and replacement strands are made in the same production run as the panels, with the same dye lot and the same counted sheet.

Ordering them afterwards means a second production cycle for a handful of strands, at the back of a queue, in a different dye lot. That is the single most common avoidable programme failure on a specified bead installation.

Can production be compressed by paying more?

Production cannot be compressed by paying more. The 40 to 60 day figure is strung by hand against a counted sheet, panel by panel, and sampling is quoted separately and takes its own time.

What can be compressed is everything the project controls: the completeness of the brief, the speed of the approvals, and the decision not to re-sample for something that could have been drawn correctly the first time.

Good to know

Questions buyers ask about Programme and lead-time planning for beadwork

What tolerance should be allowed?

Hold float before production starts rather than between delivery and installation. The compressible parts of this programme are the approval loops and the decision-making; production and freight are not compressible and installation is a single afternoon.

What should be sampled before approval?

Everything that affects the programme: the colourway, a full strand, the header detail and the hem at full drop. A second sample round costs another 16 to 20 days plus transit, so the first sample should be asked to answer every open question at once.

How does maintenance change the choice?

It changes the end of the programme, not the middle. Spares and replacement strands are made in the same run as the panels, so they have to be ordered at the same time. Ordering them later means a second production cycle for a handful of strands.

What is the performance limit here?

The 40 to 60 day production figure starts at sample approval, not at order. A project that expects beadwork eight weeks from a first enquiry has not allowed for the quote, the brief, the sample, the transit and the approval, and those together are usually longer than the production.

Who coordinates the fixing?

The contractor, and it is on the critical path in a way people miss. The header fixing has to be installed and load-tested before the panel arrives, which means the fixing detail has to be issued well before the panel is shipped.

What does the as-built pack need?

The actual dates: brief agreed, sample approved, production completed, shipped, installed. On a phased project the second phase will be planned from the first phase's real durations rather than from published ones.

What has to appear on the drawing?

Nothing from this page. Programme belongs in the programme. What does belong on the drawing is anything that would trigger a re-sample — a tolerance, a colour reference, a hem profile — because a re-sample is the single largest programme risk on a bead package.