Specification · Handover

As-built documentation

Nine documents. Hand over all nine and the panel is a maintainable asset; hand over the care card alone and it is a disposable one.

The short answer

The handover pack needs the colour-count sheet, the bead references with their colour approvals, the sealed sample reference and location, the as-built dimensions, the fixing and substrate detail, the panel weight as installed, the care card, the spares inventory, and any test report with its named standard and build.

Key takeaways

  • The colour-count sheet is the most important document in the pack and the most often missing.
  • Record the substrate and fixing as found and as used, not as drawn.
  • Record the panel weight as installed; nothing else gives a future specifier that number.
  • A test report is only transferable if it names the exact build tested.
  • Name the element that meets each performance requirement, so compliance is never inferred from silence.

Will the panel survive its specifiers?

Whether the panel survives the people who specified it. An installation with a complete pack can be cleaned, repaired, matched and rehung in ten years by people who have never met anyone involved. One without cannot.

A bead map worked out in beads themselves: one bead to a grid position, the flat geometric repeat that a beadworker follows strand by strand.

The decision is to list the pack as a deliverable. Asked for in general terms, what arrives is a care card.

Which nine documents belong in the handover?

What should be handed over, and where each item comes from.
DocumentWhat it containsWhy it matters later
Colour-count sheetEvery bead in every strand, position by position, with dropsThe only document a replacement strand can be built from
Bead references and colour approvalsEach bead with its colour reference, method and dye-lot policyA later match needs the method, not just the colour
Sealed sample reference and locationThe reference number and where the sample is heldEvery matched-to-sample tolerance depends on it existing
As-built dimensionsOpening as found, panel as made, mounting positionA replacement is ordered from these, not from the drawing
Fixing and substrate detailSubstrate as found, fixing type and size, positions, any pattressA rehang after refurbishment depends on it
Panel weight as installedWeighedNo panel weight is published; this is the only record
Care cardMethod by material, interval, access methodThe facilities team's working document
Spares inventoryItems, quantities, dye lot, storage locationSpares with no inventory are loose stock
Test report, if commissionedStandard, laboratory, date and exact build testedNot transferable without the build description
Untested statementWhat is not certified: fire, acoustic, weight unless weighedPrevents compliance being inferred from silence

The handover requirement, as a listed deliverable with the nine documents named. That is drawing and specification content because it has to be priced and scoped.

The most important of the nine is the colour-count sheet, and it is the one least likely to be asked for by name, because most specifiers do not know it exists.

How do you write the pack into a specification?

Write the nine documents into the specification as a deliverable. Assign each to whoever can actually produce it: the maker supplies the colour-count sheet, bead references, sealed sample and care card; the contractor supplies the substrate, fixing and as-built dimensions; somebody has to weigh the panel.

Then name the element that meets each performance requirement, explicitly, so that silence is never read as compliance.

Do production documents travel to handover?

That the documents exist in the production process and do not automatically travel. The colour-count sheet is built for every design, because nothing can be strung consistently without it. Bead references and colour amendments exist as approved documents. First-article and lot inspection records exist through our own inspection house.

All of that is generated anyway. The gap is not in producing the documents; it is in asking for them at handover.

Which three items are recorded as found?

Three things recorded as found rather than as drawn: the opening dimensions, the substrate, and the panel weight. All three are measurements somebody took on site and nobody usually writes down.

The weight is the one with no other source. No panel weight is published for beaded décor, so if the installed panel was weighed, that figure is the only one in existence for that build.

What has to be recorded about colour?

It changes what has to be recorded about colour. A body-coloured pressed glass bead can be matched later from its reference. A surface-dyed seed bead cannot reliably be, so the pack has to record the dye lot and the policy as well as the reference.

Dyed-to-match relationships have to be written out component by component, because a pack that records only the colour of each bead loses the relationship that made the design work.

How are agreed tolerances recorded?

Record the tolerances as agreed, with the sealed sample reference beside them. A tolerance that reads "matched to sample" is meaningless in a pack that does not say where the sample is.

As-built dimensions should be recorded as measured, including where they differ from the drawing. A pack that tidies the dimensions back to the drawing is less useful than one that admits the opening was eight millimetres narrow.

Who records the substrate as installed?

The contractor records the substrate and the fixing as installed. That is the one item nobody else can supply, and it is the one most often reduced to a copy of the drawing detail.

Where a pattress, a spreader plate or a hanger back to a slab was installed, that detail is the highest-value line in the pack and will be invisible to anyone who takes the panel down in future.

Who produces each handover document?

The specification carries the deliverable list and the allocation of who produces each document. The schedule carries the per-opening data that ends up in the pack: location, dimensions as found, substrate, colourway, panel weight.

In practice the schedule becomes the index to the pack, which is a good reason to keep it structured per opening from the start.

Why is a brochure not a handover pack?

With a pack that contains a brochure, a care leaflet and nothing else. It satisfies the contractual requirement for operation and maintenance information and is useless for maintaining anything.

The second failure is a sealed sample that cannot be located. Every tolerance expressed as matched to sample becomes unenforceable the moment the sample is lost, and nothing in a handover pack replaces it.

Where does the sealed sample end up?

Nothing new, but something should be retained. The sealed sample belongs in the handover rather than in a studio drawer, and the pack should record where it went.

Which documents does a facilities team need?

Maintenance is the reason the pack exists. Three of the nine documents — the care card, the spares inventory and the colour-count sheet — are the ones a facilities team actually opens.

If a pack has to be reduced for any reason, those three are the ones to keep. The rest support a future specifier; those three support the next ten years.

What can a handover pack actually contain?

A pack hands over what the project generated. Fire performance appears where a test was commissioned against the specified build, the panel weight appears because the approved sample was weighed, and the acoustic requirement appears against the element that meets it.

Saying that in the pack, in a sentence, is the difference between a real record and one that a future reader will mistake for a set of certificates.

Good to know

Questions buyers ask about As-built documentation for beadwork

What has to appear on the drawing?

The handover requirement itself, listed as a deliverable. A specification that asks for operation and maintenance information in general terms will receive a care card, which is one of nine documents and the least useful of them for anything beyond dusting.

What tolerance should be allowed?

Record the tolerances as agreed rather than as proposed, and record the as-built dimensions as measured. The pack is a record, so the only discipline that matters is that it says what happened rather than what was intended.

What should be sampled before approval?

Nothing, but something should be retained: the sealed sample. It is part of the handover rather than part of the approval, and a project that loses the sample between approval and handover has lost the control that half its tolerances referred to.

How does maintenance change the choice?

Maintenance is the reason the pack exists. The care card, the spares inventory and the colour-count sheet are the three documents a facilities team actually uses, and all three are commonly absent from a pack that contains a product brochure instead.

What is the performance limit here?

A handover pack states what was tested on this build and what each figure was taken from. Fire performance is tested on the specified build and the report travels with the pack; panel weight is the measured weight of the approved sample; and beadwork is a visual and spatial device rather than an acoustic one, which the pack should say in those words so nobody reads an absence as a compliance claim.

Who coordinates the fixing?

The contractor records what they actually fixed into. That is the single item in the pack that cannot be supplied by anyone else, and it is the one most often reduced to the drawing detail rather than the as-installed condition.

Keep exploring

Related pages

Specification

Panel density

Pitch against bead diameter, the open area it leaves, and how density moves weight and opacity together.

See the detail

Start a conversation

Bring us a bead you cannot find

Send a reference, a colour chip or a sketch. Minimums are set per design and confirmed per quote; sampling is quoted separately and usually runs 16 to 20 days from an agreed brief.