Guide · Install

How high to hang it, and the floor gap

The gap at the floor is the only dimension on a bead panel that is purely a wear decision. Nobody notices it and everybody lives with its consequences.

The lower ends of six bead strands, each finishing in a single larger faceted drop knotted below the last seed bead.

The short answer

Finish the lowest beads clear of the floor rather than brushing it. The published guidance is that full-length strands should stop just above the floor so they hang freely without dragging, and a few centimetres of clearance is what makes that reliable across an uneven floor. Brushing looks deliberate and wears the bottom bead and the end finish.

Key takeaways

  • Strands should stop just above the floor, hanging freely without dragging.
  • A brushing hem abrades the bottom bead and works the end finish on every pass.
  • Floors are rarely level across an opening, so a gap absorbs the error a zero gap exposes.
  • On a hard floor a brushing hem chips glass; on carpet it collects fibre.
  • Decide the gap before measuring the drop, because the drop is the opening height minus the gap.

What does setting the floor gap actually involve?

A beaded door curtain seen flat on, close strands of honey and cream beads under a fringed header band, parted down the centre to leave a clear doorway opening.

One decision, taken before any measurement: how far the lowest beads finish above the floor.

It sounds trivial and it determines the panel's drop, which is a specified dimension and the main cost lever after bead material and construction. Decide the gap, subtract it from the opening height, and you have the drop to order. Decide it afterwards and you are shortening strands.

Which heights and floor checks come first?

The opening height, measured from where the header will sit. A look at the floor across the whole width — not one measurement, because floors slope.

And a spacer: a block, a book, anything of the thickness you want the gap to be. A physical reference beats a measurement at every strand, because a tape held to an uneven floor reads differently at every point.

How do you set the drop and gap?

  1. Decide where the header will sit, inside the reveal or above the frame.
  2. Measure from there to the floor at the left, the centre and the right. Use the shortest.
  3. Choose the gap. A few centimetres is the conservative answer for almost every case.
  4. Subtract the gap from the shortest measurement. That is the drop.
  5. Order or set the panel to that drop.
  6. Once hung, let it settle a day before judging the gap, because the hem drops slightly as the strands come out of their packing shape.
  7. If the gap is now too small, raise the header rather than shortening the strands.

Why is the gap a wear decision rather than a style one?

Because it is where the panel meets a surface. Every pass through a brushing panel drags the bottom bead across the floor, and that does three things: it abrades the bead, it jolts the end finish, and it collects whatever is on the floor and carries it up the strand.

The bead is the visible casualty and the end finish is the important one. A knot or a crimp that takes a small jolt thousands of times is a knot or crimp that eventually lets go, and when it does, the strand empties.

How does the floor itself change the answer?

The gap decision against the floor it sits above, as construction guidance.
FloorBrushing hemSmall gapGenerous gapNote
Hard tile or stoneChips glass beadsGoodGoodThe worst floor for a brushing hem
Timber or laminateMarks the end beadGoodGoodAlso marks the floor finish
Short carpetCollects fibreGoodGoodStrand ends snag on pile
Deep carpet or rug edgeStrands lift and tangleMarginalGoodA rug edge is a trip point for strands
Uneven floorVisibly inconsistentMarginalGoodThe gap absorbs the level error
Threshold stripCatches on every passMarginalGoodMeasure the drop to the strip, not the floor

What does a brushing hem actually look like after a year?

On tile or stone with glass beads: chipped bottom beads, unevenly, because the strands that are walked through most take the most contact. The chips catch light differently, so they read before the eye works out what it is looking at.

On carpet: fibre wound into the bottom beads and the end finish, and strands that have started to lift rather than hang, because the pile holds them.

On timber: a faint arc of marking on the floor finish, and a dulled bottom bead.

What is the right gap, in practice?

The published guidance is that full-length strands should stop just above the floor so they hang freely without dragging. In practice, a few centimetres is what makes that reliable, because it absorbs three things at once: the floor's own level error, the settling drop in the first day, and the seasonal movement of a timber floor.

Larger gaps are a style decision rather than a wear one. A panel that stops at the top of a skirting line reads as deliberate; one that stops ten centimetres short of the floor reads as a mistake.

Why is the gap so often forgotten?

Measuring to the floor and forgetting the gap entirely, which produces a brushing panel. Measuring at one point on an uneven floor. And trimming on the day of installation, before settling, which produces a panel that is short by the weekend.

The fourth: a threshold strip or a rug edge inside the opening that nobody measured to, so the panel clears the floor and catches on the strip.

Why never cut strands to make a gap?

Never shorten strands to make a gap on the evening you hang the panel. Never weight the bottom strands to stop them lifting on carpet — that accelerates the end-finish failure rather than solving it. Never cut strands individually to follow an uneven floor, because the floor will not stay the shape it is and the panel will.

Which bead material makes the gap non-negotiable?

Glass is the material that makes the gap non-negotiable, because it is the only bead family that chips. Acrylic will scuff and not break. Wood will mark and dull. Bamboo marks and does not recover. Faux capiz discs are thin and broad, and a disc dragged on a floor chips at the edge where it is thinnest.

Weight matters too, in a counter-intuitive direction: a heavy glass strand presses harder on the floor at the point of contact, so a brushing glass hem does more damage per pass than a brushing acrylic one.

How long does getting the gap right take?

Nothing, if decided first. If decided after the panel is hanging, the choice is a new header fixing — ten minutes — or shortening every strand, which is a couple of hours and irreversible.

Is the gap an input or an outcome?

Takes the gap as an input to the drop rather than as an outcome of it. The drop is specified, every strand is built to the bead-by-bead sheet rather than measured against its neighbour, and the finished panel is checked for strand length consistency at first-article and lot inspection before export packing.

That matters because a shaped hem makes the gap more complicated, not less. On a scalloped arch the lowest strands set the gap and the highest ones are a long way off the floor — one valance build runs a longest strand of 24 in against a shortest of 10 in across the same 30-strand header. The gap has to be set against the longest strand, which has to be known before the shape is drawn.

Which two lines cover the floor gap?

Two lines. Decide the floor gap before measuring the drop. And a panel that brushes the floor will wear at the bottom bead and at the end finish.

If the listing states the drop and the gap the panel was designed for, this is pre-empted — and the panel arrives at a length that works rather than a length that needs an afternoon.

Good to know

Questions buyers ask about the floor gap on a bead panel

Do I need tools to set the floor gap?

A tape, and a spacer. The spacer is the trick: a block of the gap's thickness laid on the floor under the panel gives you a physical reference to mark against, which is far more reliable than measuring from the floor at each strand.

Will a brushing hem damage the cord?

Not the cord directly, but it works the end finish on every pass, and a failed end finish empties the strand. The bead at the bottom takes the abrasion and the knot or crimp takes the repeated small jolt, which over years is the more likely failure of the two.

Does the answer change for glass beads?

It becomes more important. Glass is the only bead family that chips, and the bottom bead of a brushing strand strikes a hard floor thousands of times. On tile or stone, a glass panel should never brush the floor; on carpet the consequence is cosmetic rather than structural.

Can a retailer set this before display?

Yes, and a display panel should be hung with a deliberate gap for a practical reason: a shop floor is walked on constantly, and a brushing hem in a shop gathers dust and grit that then abrades every bead it touches. Hang it clear.

What if a strand has already broken at the hem?

Repair it, then look at the gap. A strand that has failed at the bottom on a brushing panel is telling you something about the gap rather than about the strand. The repair is a re-string in the original bead order, re-knotted at the header.

How long should setting the gap take?

It takes no extra time at all if it is decided before measuring, and an afternoon if it is decided afterwards — because then it means shortening every strand. That asymmetry is the whole argument for deciding it first.

Can the gap be corrected after the panel is up?

Upwards, easily: raise the header, which costs one new fixing. Downwards, not really: a longer drop means rebuilding the bottom of every strand. Err towards too long rather than too short, because length can be removed and cannot be added.

Keep exploring

Related pages

Start a conversation

Bring us a bead you cannot find

Send a reference, a colour chip or a sketch. Minimums are set per design and confirmed per quote; sampling is quoted separately and usually runs 16 to 20 days from an agreed brief.