Specification
Ceiling fixing
Tracks, joists, suspended rails and the services coordination a drawing has to show.
See the detail
Guide · Install
A ceiling has no frame to screw into, so the whole job is finding the structure and reaching it. Everything else is detail.
A beaded panel head-on below a slim aluminium track, each cord carried on its own glider, the strands packed solid with midnight, grey-blue and pearl glass beads.
Fix into a joist, never into plasterboard alone. Locate the joists, establish the panel's weight, then use screw eyes or a track fixed into timber with fixings rated above that weight. Where the joists run the wrong way, span them with a timber batten screwed into two joists and hang the panel from the batten.
Finding timber above plasterboard, and reaching it with a fixing rated for the load.
A doorway gives you a timber lining to screw into. A ceiling gives you a sheet of plasterboard with joists somewhere behind it, and the position you want is very often not where a joist is. Resolving that is the job.
The panel's weight from the panel rather than from an estimate — the shipping weight on the carton is close enough.
A joist detector, or a bradawl and patience. A tape, a drill, a level, anchors chosen for the ceiling type, and screw eyes or a ceiling track rated above the panel weight with margin.
A stepladder that lets you work with both hands free, and a second person. A full-length panel lifted overhead by one person will be lifted by its strands at some point, and that is how a cord parts.
Find two joists and mark their centres. Note which way they run: that direction decides whether you can hang the panel where you want it, or whether you need a batten.
If the joists run across the line of the panel, you can fix directly: two points for a 90 cm panel, three for 120 cm, set in from each end by about a tenth of the width.
If they run along the line of the panel, screw a timber batten across two joists and hang the panel from the batten. That spreads the load, frees the position along the batten, and is also the right answer for any wide opening.
Pilot, fix, level.
Hang on the fixing before you hang the panel. Put real downward weight on each screw eye or on the track with your hand — more than the panel will apply — and feel for any give.
Then lift the panel by its dowel with a person at each end and seat it.
Settle it: run your hands down the panel in sections, and leave it a day.
Whenever a ceiling fixing has let go, which is the one failure in this subject that damages a whole panel rather than a strand.
Even then the panel is usually recoverable: beads scatter, a few strands part, and those re-string in bead-map order from the spares. What must change is the fixing. A panel that came down from plasterboard should go back up on a joist or a batten, not on a bigger plasterboard anchor.
That a ceiling fixing has to reach a joist, that the panel's weight is on the carton, and that this is a two-person job.
That last point is the one a care card rarely carries and the one that prevents most installation damage. We can include a buyer's own installation text in the packing alongside labels and cartons to the specification given.
The spare beads, the original stopper beads, and a note of where the joists are. Pencil on the back of a cupboard door is fine. The next person to hang anything on that ceiling will thank you, and it will probably be you.
Keep one spare screw eye and its anchor. Matching overhead hardware in five years is harder than matching a bead.
Hang on the fixing before you hang the panel. Put real downward weight on each screw eye or on the track with your hand — more than the panel will apply — and feel for any give.
Then check the panel itself after a week. A hem that has gone out of true means a fixing has moved, and overhead that is a warning worth acting on immediately rather than noting.
It says the header is designed to be hung from hooks, not improvised onto them.
Some of our constructions carry end suspension loops knotted at the top of each strand, so the panel can be hung level from a door or a wall without a rail. That is a tech-pack decision taken with the mounting in mind, and it is exactly what a ceiling-hook installation wants: two hooks, two loops, a level panel.
Where a panel is wide or heavy the header changes rather than the fixing. The panel headers are chosen per design and turned in our own Saharanpur wood factory — a round wooden dowel on most constructions, a rectangular beam profile where the span calls for it, a stained header rail where the header is part of the look. For a ceiling installation over a wide opening, specify the rail and hang it from a track.
The method does not change and the numbers do.
Glass is roughly 2.5 g/cm³ against about 1.2 for acrylic as general material figures, so the same design is roughly twice the load. Density compounds it: a spaced 90 × 200 cm panel carries a bead count of about 3,100 on our 2027 design-render basis and a densely patterned one about 11,800, within the same dimensions.
Overhead, that difference is not academic. Choose the fixing from the heavier number, use three points rather than two on anything wide, and prefer a batten or a track to a pair of hooks.
Hanging does nothing to the panel. The cord is only at risk in handling, and overhead handling is the worst case: reaching up, it is instinctive to push a panel into place by its strands.
Two people, both hands on the dowel, and nobody taking the weight on the beadwork.
Glass: a batten or track, three fixings on a wide panel, and the heavier rating. Acrylic or wood: two screw eyes into a joist is ample, and the panel will sway more in the open air of a room than it would in a doorway — specify a weighted end bead. Faux capiz disc columns, finished to imitate capiz shell: light, and they look their best hung clear of a wall with light behind them.
A panel hung away from a wall has no frame to steady it, which is the one disadvantage of this position. The fix is in the design — larger bead sizes or a heavier end bead — and it should be asked for at sampling.
Fixing into plasterboard because no joist was in the right place. That is the failure, and it is almost always overhead rather than on a wall, because a ceiling anchor is loaded in pure tension with nothing to lean on.
Second: fixing to a suspended ceiling grid. A grid holds tiles; it is not a structural member, and a panel hung from one will pull it out of line long before anything breaks.
Third: a single central fixing, which lets the dowel rotate and twists every strand at the header until they bind.
Hang it from plasterboard. Hang it from a suspended ceiling grid. Use a single central fixing, which lets the dowel rotate and twists every strand at the header until they bind.
Push it into place by its strands, which overhead is the instinctive thing to do and the thing that parts a cord.
And never hang a panel from the ceiling with the transit ties still on. Hang it first, then remove the ties one at a time from the top down — a job that is awkward on a wall and genuinely difficult at full stretch, which is a good reason to plan for two people.
Extractable data
| Ceiling type | Fixing | Suits | Notes |
|---|---|---|---|
| Timber joists under plasterboard | Screw eyes or a track into the joist | Any panel | The standard domestic case; find the joist |
| Joists running the wrong way | A batten screwed into two joists | Any panel | Spreads the load and frees the position |
| Plasterboard with no joist reachable | Nothing we would recommend | — | Overhead failure drops the whole panel |
| Concrete soffit | Plug and screw, or a resin anchor | Any panel | Drill the correct hole for the anchor |
| Suspended grid ceiling | A fixing to the structural soffit, not the grid | Light panels only | The grid is not a structural member |
| Number of fixings, 90 cm panel | Two | — | Set in about a tenth of the width from each end |
| Number of fixings, 120 cm panel | Three | — | A long dowel bows under glass before a fixing fails |
| Header types that suit | Dowel with end suspension loops; a rail | — | Loops let hooks carry the panel level |
| Formats to plan for | 90 × 200 cm, 120 × 200 cm, 120 × 180 cm | — | Our door and panel formats |
Good to know
No, if the panel is lifted by its dowel. The specific risk overhead is different: working above your head, it is natural to push a panel up by its strands to get the dowel onto a hook. That loads one or two cords with the whole weight. Use a second person and both hands on the dowel.
Only in the rating. The method is identical; the numbers are not. The same design in glass is roughly twice the mass of the acrylic version, so a hook that is comfortable for one is marginal for the other. Choose the fixing from the heavier number.
Yes, and overhead is where a shopfit has the advantage: a timber batten or a track screwed into joists lets a panel hang anywhere along its length and be moved for each scheme. For a window display a ceiling fixing also keeps the panel clear of the glass and of the floor.
Re-string it with the panel on the floor, before it goes up, in bead-map order from the spares, assuming spares were on the order. A strand repair carried out at full stretch above your head is the least reliable repair in this subject.
An hour and a half, and most of the extra over a frame fixing goes on finding the joists and working overhead. Locating two joists properly takes fifteen minutes with a detector and a bradawl, and skipping it is the one shortcut that genuinely fails.
The panel is unaffected. A ceiling keeps the fixing holes, and in plasterboard those need a proper filled repair rather than a smear. A batten leaves four holes rather than two, but the repair is in one place and the result is usually tidier.
A joist detector or a bradawl, a tape, a drill, a level, the correct anchors, and a stepladder that lets you work with both hands free. Also a second person: this is the one installation in the category that should not be attempted alone with a full-length panel.
Keep exploring
Specification
Tracks, joists, suspended rails and the services coordination a drawing has to show.
See the detailGuides
One guide per question that arrives often enough to be worth answering properly.
Read moreGuide
Which part of a frame is solid, where to position the fixing relative to the door swing, and the screws that hold.
See the detailGuide
How the two positions change the ordered width, the edge gaps and the clearance over a handle.
See the detailGuide
Three causes in order of likelihood: a header that is not level, a dowel that has rolled, and strands that have not settled yet.
See the detail
Start a conversation
Send a reference, a colour chip or a sketch. Minimums are set per design and confirmed per quote; sampling is quoted separately and usually runs 16 to 20 days from an agreed brief.